Download presentation
Presentation is loading. Please wait.
Published byJavon Stripe Modified over 9 years ago
2
FAD Urg of Need A B C I01 04 11 II02 05 12 III03 06 13 IV07 09 14 V08 10 15 Depot PD 1-3 = IPG 1 PD 4-8 = IPG 2 PD 9-15 = IPG 3 IPG = TP 1 = 1 2 = 2 3 = 3 Rank order processing of requisitions in PD sequence when limited assets ICP system DoD 4140.1R, App 8 CONUS TP 1 = AIR TP 2 = AIR/SURFACE TP 3 = SURFACE DoD 4140.1R, App 8 OCONUS TP 1,2 = AIR TP 3 = SURFACE SERVICES COCOMs TRANSPORTATION FULFILLMENT AGENTS SUPPLY FULFILLMENT AGENTS Current Supply & Transportation Priority Process Current Process Governed by MILSTRIP Regulations Each Service/Fulfillment Agent has Work Arounds No Significant Changes to Process in 40 Years USA USAF USN USMC RQN USA USAF USN USMC RECPT DEPOT REPAIR FACILITY DEPOT LEVEL REPARABLE/RETROGRADE PROCESS REPAIRED DRMODISPOSAL = Potential Areas for Improvement/Change
3
MILSTRIP REGULATIONS CONUS DISTRO CENTERS CONUS SPOD CONUS APOD OCONUS APOD OCONUS SPOD THEATER DISTRO CENTERS AIRAIR GRDGRD AIR or SURFACE DLMSO Monitors FAD I SERVICE ACA CHALLENGES/ GREEN SHEETS SERVICESSERVICES RQN SERVICESSERVICES RECPT Current Supply & Transportation Priority Process Work Arounds = Potential Areas for Improvement/Change USAF/USMC/Navy Follow MILSTRIP But Intensively Manage Mode Selection by RDD USAF Only Service To Interdict And Redirect Cargo “On The Fly” DLA JCS Project Codes/999 Army DSS ALOC Logic COCOMs Via ACA/TDCs
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.