Download presentation
Presentation is loading. Please wait.
Published byAnita Crichlow Modified over 10 years ago
2
SARE Group represents a global investment fund focused on investing in the high growth residential real estate segment in India. SARE is an international real estate company with a market capitalization of US$0.5bn, focused on developing residential real estate in India. It is managed by a select team of leading professionals drawn from all across the globe, with offices in London, Mumbai and New Delhi. SARE's mission is to become the leading vertically integrated real estate developer of mixed-use residential housing communities in India. With a strategic vision to embark on multiple projects on a pan India basis, the company is focused on developing large canvas projects in Tier I city suburbs as well as in Tier II cities. Till date the company has invested and acquired over 800 acres for development in the following Major high growth cities; Ghaziabad, Amritsar, Chennai, Manesar, Indore and plans to increase land under development to 2,000 acres over the next year. SARE combines local understanding with innovative design, modern project management and construction methods to build homes offering a quality lifestyle at excellent value for money. ABOUT SARE
3
SARE’s PRESCENCE PAN INDIA Crescent ParC, NH-24, Ghaziabad Crescent ParC, Sector92, Gurgaon Crescent ParC, Amritsar Crescent ParC, OMR Road, Chennai
5
About Gurgaon Gurgaon is the sixth largest city in the Indian state of Haryana. Gurgaon is the industrial and financial center of Haryana. An important town in ancient Hindu mythology. Gurgaon is one of Delhi's four major satellite cities and is part of the National Capital Region of India. Over the past 10 years the city has undergone rapid development and construction. A wave of Multinational companies choose to locate their centers in Gurgaon. Gurgaon is regarded as the best city in India to work and one of the best city in India to live according to a survey by Business Today magazine. The per capita income in Gurgaon is the 3rd highest in India after Chandigarh and Mumbai Real estate in Gurgaon has sky rocketed to levels comparable with international cities like London.
6
Location Map
7
Crescent ParC with all facilities Lifts 24 Hrs Security Power Backup Professional Facility Management Services Proposed International High School Proposed Primary & Nursery School ISBT & Metro Connectivity KMP Highway Pollution Free Environment Indoor Games Gymnasium Swimming Pool
8
Plan Layout – 3BHK (S+4) Size:1314 Sq. ft.
9
Plan Layout – 3BHK+3T+S (S+4) Size:1482 Sq. ft.
10
Plan Layout – 4BHK + 4T (S+4) Size:1620 Sq. ft.
11
Plan Layout – 3BHK + 3T+S (S+14) Size:1516 Sq. ft.
12
Plan Layout – 4BHK + 4T+S (S+14) Size:1850 Sq. ft.
13
Living / DiningFlooringVitrified Tiles BedroomsFlooringVitrified Tiles / Imported Laminated Wooden Floorings Wall FinishOil bound distemper in pleasing shades ToiletWall FinishCombination of Ceramic Tiles,Oil Bound Distemper & Mirror CounterPolished Granite in Master Bedroom Toilet FlooringCeramic Tiles Fittings ISI standard Washbasin and WC's. Conventional Chromeplated of standard make with shower Kitchen Flooring & DadoCeramic Tiles PlatformGranite Counter Wall Finish Ceramic Tiles 2ft. Above the counter and oil bound distemper in pleasing shades in the balance area OtherStainless Steel sink with drain board Main Door Polished Hardwood Frame with Moulded Skin Door Internal Door Painted Hardwood Frame with Moulded Skin Door / Flush Doors Electrical Copper Wiring with modular switches. Circuits with MCB's of standard make. Power Backup Adequate Power Back Up BHK- 3 KVA, 4BHK- 4 KVA Security Gated Complex INDULGENT SPECIFICATION
14
Price List Flat TypeBuilding type Basic Rate Per (Sq. Ft) Area (Sq.ft) Basic Cost (Rs.) Inaugural Discount Basic Rate After Discount Booking Amount (Rs.) 10% (Rs.) 3BHK Low Rise (S+4)169713142229858617582168100216810 3BHK+ Study Low Rise (S+4)16971482251495469654 2445300 244530 4BHK Low Rise (S+4)169716202749140761402673000267300 3BHK + SQT High Rise (S+14)159715162421052 712522349800 234980 4BHK + SQT High Rise (S+14)159718592968823 873732881450 288145
15
Preferential Location Charges (PLC) S + 4 Floors (Floor PLC) S + 14 Floors (Floor PLC) First FloorRs. 75/- Per Sq. Ft. First Floor Rs. 75/- Per Sq. Ft Second & Third Floor NIL Second Floor Rs. 50/-Per Sq. Ft Fourth Floor Rs. 150/- Per Sq. Ft. Third Floor Rs. 25/-Per Sq. Ft PLC (Corner, Club OR Park Facing) Single PLC Rs. 50/- Per Sq. Ft. Double PLC Rs. 75/- Per Sq. Ft. **Allied Charges **EDC + IDC (External Development Charges & Infrastructure Development Charges) Rs. 375/- Per Sq. Ft **Car Parking – Covered (One parking mandatory) Rs. 175000/- **Club Membership Rs. 65000/- **Power Back-up (3BHK) Rs. 45000/- (3 KVA) (4BHK) Rs. 60000/- (4 KVA) **Facilities Charges Rs. 50/- Per Sq. Ft. ** Fire Fighting Charges (only on S+14) Rs. 30/- per Sq Ft Price List
16
PLAN"Construction Link Installment"Percentage 1At the time of booking10 2On Commencement of Construction10 3 On Start of Plinth level of Tower in which unit is booked 10 + 25% Allied charges 4 On Start of First Floor Roof Slab of Tower in which unit is booked 10 + 25% Allied charges 5 On Start of Second Floor Roof Slab of Tower in which unit is booked 10 6 On Start of Third Floor Roof Slab of Tower in which unit is booked 10 + 25% Allied charges 7 On Start of Fourth Roof Slab of Tower in which unit is booked 10 8On Completion of Super Structure frame works10 9On Completion of Plumbing, Flooring & Tiles works10+ 25% Allied charges 10On Offer of Possession10 Payment Plan (S+4)
17
Payment Plan (S+14) Plan“Construction Link Installment”Percentage 1At the time of booking10 2On Commencement of Construction10 3On Start of Plinth level of Tower in which unit is booked7.5+ 25% Allied charges 4 On Start of First Floor Roof Slab of Tower in which unit is booked7.5 + 25% Allied charges 5 On Start of Second Floor Roof Slab of Tower in which unit is booked7.5 6 On Start of Third Floor Roof Slab of Tower in which unit is booked7.5+ 25% Allied charges 7On start of Fifth Roof Slab of Tower in which unit is booked7.5 8On start of Sixth Roof Slab of Tower in which unit is booked7.5 9 On start of Seventh Roof Slab of Tower in which unit is booked5 10On start of Ninth Roof Slab of Tower in which unit is booked5 11 On start of Eleventh Roof Slab of Tower in which unit is booked5 12 On start of Fourteen Roof Slab of Tower in which unit is booked5 13On Completion of Super Structure frame works5 14On Completion of Plumbing, Flooring & Tiles works5+ 25% Allied charges 15On Offer of Possession5
18
Thank You. Q ueries W elcome
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.