Download presentation
Presentation is loading. Please wait.
Published byQuinton Eppes Modified over 9 years ago
1
Quality Module Planned Flow of the Software # 006 = Quality
2
File Covers the next cell of this flow chart Purchase indent Indent Approval Purchase Order PO checking PO Approval Gate Entry Quantity MRR QA – QC Bill Passing Paymentx
3
Auto entry from MRR to QC Shows pending MRR, for which QC not done Short cut QCDetailed QC ( with parameters ) Sub-Topics Covered
4
Quality Assurance Dept process starts
5
Pending in QC Report Automatic creation of this report Visible to purchase dept Visible to Stores dept Visible to Quality dept Visible to Accounts dept Also to Production and Maintenance Depts
7
What is pending in QC, and since when ?
8
That was a LIVE automatic report Available to all Updates every 1 second Immediately after a MRR is saved by a stores person And every day end, to push further, the automatic email shoots….. ( see next page )
9
The ERP software shoots an email directly to your inbox
10
Automatic Emails start To remind the Purchase dept To followup with QA dept If required For pendency over 2 days …
11
Question : Auto email of pending in QC Send or not ? – Recommended is yes How many days pendency show in day-end email ? 3 vs 0 – Recommended is ZERO days
12
How to do the QC ? Short Cut Simple Yes / No Detailed Parameter wise, Each reason Each test result
13
Time to make Quality test for incoming material…..
14
Pending Inspection Button shows you all MRR pending for quality check
15
Select the Desired Option
16
Pending MRR
17
Inward inspection only for Incoming material and outward Inspection is only for Finish goods
18
You need to set the templates for the quality test
19
Templates set now quality department only needs to tally the fields as per requirment
21
Now time to take quality test with the help of Inward inspection reports
23
Select the item from the list
24
Make the observation and enter into the system
25
Take the print for quality test Report
26
Short Cut QC ? To be used if the QC dept is Extra busy and cannot enter the Quality plan for each item in the ERP
27
Some other screens From the QC module
30
This is the “Short cut” QC
31
1
32
1
33
After the QC The Purchase bill is “passed” In next stage “Accounts Department”
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.