Presentation is loading. Please wait.

Presentation is loading. Please wait.

Current Policy Topics Emilio Madaio Policy Development Officer RIPE NCC RIPE 63 31 Oct - 4 Nov 2011, Vienna.

Similar presentations


Presentation on theme: "Current Policy Topics Emilio Madaio Policy Development Officer RIPE NCC RIPE 63 31 Oct - 4 Nov 2011, Vienna."— Presentation transcript:

1 Current Policy Topics Emilio Madaio Policy Development Officer RIPE NCC RIPE 63 31 Oct - 4 Nov 2011, Vienna

2 Emilio Madaio, 2 November 2011 2 Overview Common policy topics in all regions Brief overview of proposals in the RIPE PDP

3 Emilio Madaio, 2 November 2011 3 Common Policy Topics (1/4) IPv4 Depletion – APNIC: entered Stage Three of IPv4 address block exhaustion. – ARIN: set aside /10 (NRPM 4.10).

4 Emilio Madaio, 2 November 2011 4 Common Policy Topics (2/4) IPv4 Depletion – AfriNIC: a new version of the Soft Landing Policy reached consensus at AfriNIC 14 with new version; ended Last Call – LACNIC: LAC-2011-04: makes mandatory to applicants that do not hold IPv6 to request it when in exhaustion to receive IPv4; LAC-2011-06 reserves a /12 for gradual exhaustion of IPv4 resources. Both in Last Call until 5 December.

5 Emilio Madaio, 2 November 2011 5 Common Policy Topics (3/4) IP Resources Transfer – AfriNIC: two proposals on transfer outside the AfriNIC region were withdrawn. – APNIC:“Maintaining demonstrated needs requirement in transfer policy after the final /8 phase” ended the Last Call phase.

6 Emilio Madaio, 2 November 2011 6 Common Policy Topics (4/4) IP Resources Transfer – ARIN: “ARIN Inter-RIR Transfers”, more input at ARIN XXVIII; the AC sent an amended version to the community and moved it to Last Call until 16 November.

7 Emilio Madaio, 2 November 2011 7 Overview on proposal status (1/4) 2006-05: PI Assignment Size, Approved 2010-01: Temporary Internet Number Assignment Policies, Approved 2011-03: Post-Depletion IPv4 Address Recycling, Approved

8 Emilio Madaio, 2 November 2011 8 Overview on proposal status (2/4) 2008-08: Initial Certification Policy in the RIPE NCC Service Region, withdrawn 2010-08: Abuse Contact Information, withdrawn

9 Emilio Madaio, 2 November 2011 9 Overview on proposal status (3/4) 2011-02: Removal of Multihomed Requirement for IPv6 PI, Last Call 2011-01: Global Policy for Post Exhaustion IPv4 Allocation Mechanisms by the IANA, Approved

10 Emilio Madaio, 2 November 2011 10 Overview on proposal status (4/4) 2011-04: Extension of the Minimum Size for IPv6 Initial Allocation: Initial Discussion 2011-05: Safeguarding Future IXPs with IPv4 Space: Initial Discussion

11 Emilio Madaio, 2 November 2011 11 RIPE PDO: References Policy Development Process (PDP) document – http://ripe.net/ripe/docs/pdp.html Current Policy Proposals – http://ripe.net/pdp/proposals http://ripe.net/pdp/proposals

12 Emilio Madaio, 2 November 2011 12 RIPE PDO Contacts – pdo@ripe.net pdo@ripe.net – PDO_RIPE_NCC (twitter)

13 Questions?


Download ppt "Current Policy Topics Emilio Madaio Policy Development Officer RIPE NCC RIPE 63 31 Oct - 4 Nov 2011, Vienna."

Similar presentations


Ads by Google