LHC Beam Operations Past, Present and Future Maria Kuhn on behalf of the LHC team 03-14-2013 Moriond QCD 2013
2
April 2010 Squeeze to 3.5 m 2008200920102011 LHC Timeline September 10, 2008 First beams around September 19, 2008 Disaster Accidental release of 600 MJ stored in one sector of LHC dipole magnets August 2008 First injection test August, 2011 2.3 x 10 33, 2.6 fb -1 1380 bunches October 14 2010 1 x 10 32 248 bunches November 2010 Ions March 30, 2010 First collisions at 3.5 TeV 1380 June 28 2011 1380 bunches November 29, 2009 Beam back 2012 18 June, 2012 6.6 fb -1 to ATLAS & CMS 6 June, 2012 6.8 x 10 33 03-14-2013 Moriond QCD 2013 2 4 July, 2012 Higgs like discovery
3
Integrated luminosity 2010-2012 3 03-14-2013 Moriond QCD 2013
4
2012: ~30 collisions/xing at beginning of fill with tails up to ~ 40. 2011: average 12 collisions/xing, with tails up to ~20 Record peak luminosity: 7.73 x 10 33 cm -2 s -1 Peak luminosity 2010-2012
5
ALICE and LHCb (and TOTEM and ALFA) Peak luminosities achieved in ALICE around 5 x 10 30 cm -2 s -1 5 03-14-2013 Moriond QCD 2013 LHCb 2012: 1.9 fb -1 delivered!
6
Luminosity NNumber of particles per bunch KbKb Number of bunches fRevolution frequency σ*σ*Beam size at interaction point FReduction factor due to crossing angle εEmittance εnεn Normalized emittance β*β*Beta function at IP 6 In 2012: ε n = 2.5 m = 5.9 x 10 -4 m * = 18.8 m (p = 4 TeV, * = 0.6m) 03-14-2013 Moriond QCD 2013
7
Performance from injectors 2012 Bunch spacing [ns] Protons per bunch [ppb] Norm. emittance H&V [ m] Exit SPS Design report 251.15 x 10 11 3.5 injected into LHC 501.7 x 10 11 1.8 tested251.2 x 10 11 2.7 N.B. the importance of 50 ns in the performance so far. This at the expense of high pile-up. 7 03-14-2013 Moriond QCD 2013
8
LHC Peak Performance in 2012 8 03-14-2013 Moriond QCD 2013 Design Report 2012 Comments Energy [TeV]7.04.0 4/7 design energy * (IP1&IP5) [m] 0.550.6 exploiting available aperture, tight collimator settings, stability Bunch spacing [ns] 2550 Number of bunches 28081374 Half nominal number of bunches, given by 50 ns Bunch intensity [ppb] 1.15 x 10 11 1.6 – 1.7 x 10 11 150 % of nominal Normalized emittance [ m] 3.75 at collision ~2.5 at collision again remarkable injector performance (but emittance preservation challenges in LHC) Peak luminosity [cm -2 s -1 ] 1.0 x 10 34 7.73 x 10 33 77 % of design luminosity
9
WHAT WE HAVE LEARNT SO FAR… 9 03-14-2013 Moriond QCD 2013
10
Excellent single beam lifetime – vacuum Excellent magnetic field quality Beam-Beam – Head-on is not a limitation Collective effects! – Single and coupled bunch instabilities Better than expected aperture * reach established and exploited – Not trivial: small beams at the IP means large beams at the triplets! In general – beam & optics 10 03-14-2013 Moriond QCD 2013
11
Operational robustness - LHC cycle Altogether good lifetime throughout the whole LHC cycle Machine remarkably reproducible – optics, orbit, collimator set-up, tune… 11 03-14-2013 Moriond QCD 2013 Pre-cycleInjection450 GeVRampSqueezeCollide
12
2012 Machine protection – the challenge met 3-12-2012 Beam 140 MJ Beam 140 MJ Not a single beam- induced quench at 4 TeV 11 magnet quenches at 450 GeV – injection kicker flash-over LHC status - Kruger 12 R. Assmann Can’t over stress the importance of this to the success of the LHC (so far). From commissioning to real confidence in under two years.
13
Availiability 13 03-14-2013 Moriond QCD 2013 Alick Macpherson
14
Machine performing well, huge amount of experience & understanding gained. Good system performance, excellent tools, reasonable availability following targeted consolidation. This is the legacy for post LS1 14 03-14-2013 Moriond QCD 2013
15
LS1 15 03-14-2013 Moriond QCD 2013
16
16 03-14-2013 Moriond QCD 2013
17
LHC MB circuit splice consolidation proposal Phase I Installation of new shunts Phase II Application of clamp and bus bar insulation Phase III Insulation between bus bar and to ground, Lorentz force clamping 27 03-14-2013 Moriond QCD 2013
18
POSSIBLE LIMITATIONS FOR POST LS1 18 03-14-2013 Moriond QCD 2013
19
25 ns & electron cloud Photoelectrons from synchrotron radiation accelerated by the proton beam Electrons bounce into chamber wall → secondary electrons are emitted Due to short bunch spacing, high bunch intensity and low emittance: electron cloud build-up! 03-14-2013 Moriond QCD 2013 19
20
Electron cloud: possible consequences single-bunch instability multi-bunch instability emittance growth gas desorption from chamber walls heat load particle losses, interference with diagnostics,… 20 03-14-2013 Moriond QCD 2013 Electron bombardment of a surface has been proven to reduce drastically the secondary electron yield (SEY) of a material. This technique, known as scrubbing, provides a mean to suppress electron cloud build-up and its undesired effects
21
25 ns & electron cloud Downside: scrubbing takes time (several weeks!) Electron cloud free environment after scrubbing at 450 GeV seem not be reachable in acceptable time. Post LS1 operation with high heat load and electron cloud density seems to be unavoidable. 21 03-14-2013 Moriond QCD 2013 Reconstructed comparing heat load meas. and PyECLOUD sims. The SEY evolution significantly slows down during the last scrubbing fills (more than expected from simulations and lab. experiments) End of 2012 tests Giovanni Iadarola and team - Evian 12
22
UFOs UFOs: showstopper for 25 ns and 6.5 TeV? – 10x increase and harder UFOs – (but no increase in low intensity fills) UFO “scrubbing”: does it work? Deconditioning expected after LS1 Post LS1 operation: start with lower energy and/or 50 ns 22 03-14-2013 Moriond QCD 2013 Tobias Baer
23
OPERATIONAL SCENARIOS AFTER LS1 23 03-14-2013 Moriond QCD 2013
24
Beam from injectors LS1 to LS2 Number of bunches Bunch intensity [10 11 ppb] Emittance at injection [ m] Emittance in collisions [ m] 25 ns ~nominal 27601.152.83.75 25 ns BCMS25201.151.41.9 50 ns13801.651.72.3 50 ns BCMS12601.61.21.6 BCMS = Batch Compression and (bunch) Merging and (bunch) Splittings Batch compression & triple splitting in PS 24
25
50 ns versus 25 ns 50 ns25 ns GOOD Lower total beam current Higher bunch intensity Smaller emittance Lower pile-up BAD High pile-up Need to level Pile-up stays high High bunch intensity – instabilities… Larger crossing angle; higher * Larger emittance Electron cloud: need for scrubbing; emittance blow-up; Higher UFO rate Higher injected bunch train intensity Higher total beam current Expect to move to 25 ns because of pile up… 25 03-14-2013 Moriond QCD 2013
26
* & crossing angle * reach depends on: – available aperture – collimator settings – required crossing angle which in turn depends on emittance bunch spacing 26 03-14-2013 Moriond QCD 2013
27
Potential performance Number of bunches Bunch intensity [10 11 ppb] */ crossing angle Emittance LHC [ m] Peak Luminosity [cm- 2 s -1 ] ~Pile-up Int. Lumi per year [fb -1 ] 25 ns27601.1555/1893.750.93 x 10 34 25~24 25 ns BCMS 25201.1545/1491.91.7 x 10 34 52~45 50 ns13801.642/1362.5 1.6 x 10 34 level to 0.8 x 10 34 87 level to 44 ~40* 50 ns BCMS 12601.638/1151.6 2.3 x 10 34 level to 0.8 x 10 34 138 level to 44 ~40* All values at 6.5 TeV collision energy 1.1 ns bunch length 150 days proton physics 85 mb cross-section * different operational model – caveat - unproven All numbers approximate 27
28
Potential performance – in words Nominal 25 ns – gives more-or-less nominal luminosity (1.0 x 10 34 cm- 2 s -1 ) BCMS 25 ns – gives a healthy 1.7 x 10 34 cm- 2 s -1 – peak around 50 – 83% nominal intensity Nominal 50 ns – gives a virtual luminosity of 1.6 x 10 34 cm- 2 s -1 with a pile-up of 87 – levelling mandatory BCMS 50 ns – gives a virtual luminosity of 2.3 x 10 34 cm- 2 s -1 with a pile-up of 138 – levelling even more mandatory 28 03-14-2013 Moriond QCD 2013
29
2015 STRATEGY – FOR DISCUSSION 10-12-12 LHC Operation 29
30
30
31
Conclusions Availability better than might have been expected. Machine now magnetically, optically, operationally well understood System performance – generally good to excellent – issues identified and being addressed Limitations well studied, well understood and quantified – still some potential implications for post LS1 operation Restart post LS1 with 50 ns – before moving to 25 ns – non electron cloud free environment to be accepted at least initially 31 03-14-2013 Moriond QCD 2013
32
BACKUP 10-12-12 LHC Operation 32
33
Post LS1 energy Our best estimates to train the LHC (with large errors) – 30 quenches to reach 6.25 TeV – 100 quenches to reach 6.5 TeV Two quenches/day 2 to 5 days of training per sector The plan – Try to reach 6.5 TeV in four sectors in March 2014 – Based on that experience, we decide if to go at 6.5 TeV or step back to 6.25 TeV in March 2014 Ezio Todesco – Chamonix 12 33 03-14-2013 Moriond QCD 2013
34
2015 strategy – more detailed Low intensity commissioning of full cycle – 2 months First stable beams – low luminosity Intensity ramp-up – 1 to 2 months 50 ns operation (at pile-up limit) – Characterize vacuum, heat load, electron cloud, losses, instabilities, UFOs, impedance Options thereafter: – 1 week scrubbing for 25 ns, say 1 week to get 25 ns operational (if * and crossing angles are changed), intensity ramp up with 25 ns with further scrubbing required – Commission levelling of 50 ns and push bunch intensity up, emittance down… not at all favored by experiments! 34 03-14-2013 Moriond QCD 2013