Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Danube River – Access way to Constantza Port The 4 th of October 2007, Budapest Monica Patrichi Expert Ministry of Transport General Directorate for.

Similar presentations


Presentation on theme: "The Danube River – Access way to Constantza Port The 4 th of October 2007, Budapest Monica Patrichi Expert Ministry of Transport General Directorate for."— Presentation transcript:

1 The Danube River – Access way to Constantza Port The 4 th of October 2007, Budapest Monica Patrichi Expert Ministry of Transport General Directorate for Naval Transport

2

3 ROMANIAN DANUBE SECTOR In Romania the Danube River has a length of 1.075 km., which means cca.44.4% of the total navigable length. On the Romanian sector Danube is divided in two parts according to the navigation clearance: 1. River Danube (km. 1,075 – km.175) 1. River Danube (km. 1,075 – km.175) - sector with retention regime (km. 1,075 – km. 863) - sector with retention regime (km. 1,075 – km. 863) - sector with free flows (km. 863 – km. 175) - sector with free flows (km. 863 – km. 175) Waterway width 180 m. Waterway depth 3.5 m. Waterway width 150 - 180 m. Waterway depth 2.5 m.

4 ROMANIAN DANUBE SECTOR - Maritime Danube (km. 175 – Nm. 0) - Maritime Danube (km. 175 – Nm. 0) - Danube (km.175 – Nm. 34.75) - Danube (km.175 – Nm. 34.75) - Sulina Canal (Nm. 34.75 – Nm. 0) Waterway width 150 - 180 m. Waterway depth 7.32 m. Waterway width 60 m. Waterway depth 7.32 m.

5 ROMANIAN DANUBE SECTOR Danube – Black Sea Canal Poarta Alba – Midia Navodari Canal Length 64.4 km. 32.5 km. Draught 5.5 m. 4.5 m. Twin locks (double) 2 (Agigea and Cernavoda) 2 (Ovidiu and Navodari) Max. convoy 18,000 to. 3,000 to. River and maritime ships 5,000 tdw. 2,000 tdw.

6 DEVELOPMENT STRATEGY Improvement of the conditions for navigation on the Romanian – Bulgarian common sector of the Danube River (km 845,5 – km 375) About 23 bottlenecks Feasibility study has started in May 2007 End: July 2008 FS value: 2.5 MEURO (ISPA and state budget) Works execution: 2010 – 2013 Estimated value of works: 144 MEUR Romania: 70 MEUR (CF and state budget) Bulgaria: 74 MEUR

7 DEVELOPMENT STRATEGY Improvement of the conditions for navigation on Calarasi – Braila sector (km 375 – km 175) Technical project, EIA and tender documents Hydrotechnical works will start in 2008 and the first phase will end in 2010. Value of works, phase I: 37,7 MEURO

8 DEVELOPMENT STRATEGY Implementation of the topohydrographical measurements and signalization systems for the Romanian Danube sector Implementation of the topohydrographical measurements and signalization systems for the Romanian Danube sector 3 specialized ships acquisition Sensors for the floating signals Value: 5.1 MEURO (50 % EBI and 50% state budget) Start: February 2007 End: April 2008

9 DEVELOPMENT STRATEGY RoRIS

10 RoRIS (Romanian River Information Services) - The traffic related RoRIS services are: FIS: Fairway Information Service a. Visual aids to navigation, b. Radiotelephone service on inland waterway, c. Internet service, d. Electronic navigation chart service. TI: Traffic Information a. TTI: Tactical Traffic Information b. STI: Strategic Traffic Information TM: Traffic Management a. VTS: Local Traffic Management (Vessel Traffic Service) b. NS: Navigational Support c. LBM: Lock and Bridge management CAS: Calamity Abatement Support

11 DEVELOPMENT STRATEGY RoRIS (Romanian River Information Services) - The transport related RIS services are: ITL: Information for Transport Logistic a. VP: Voyage Planning b.TPM: Transport Management c. PTM: Inter modal port and terminal management d. CFM: Cargo and fleet management d. CFM: Cargo and fleet management ILE: Information for law enforcement ST: Statistics CHD: Waterway charges and harbour fees

12 DEVELOPMENT STRATEGY Ro RIS, phase II Ro RIS, phase II Value: 9 MEURO (FEDR and state budget) Implementation: 2008 - 2009 Electronic Navigation Charts (ENC) Electronic Navigation Charts (ENC) Responsible: River Administration of the Lower Danube, Galati 2 centers for ENC development: Giurgiu and Galaţi

13 DEVELOPMENT STRATEGEY CONSTANTZA PORT

14 THANK YOU FOR YOUR ATTENTION ! CONTACT DETAILS: MINISTRY OF TRANSPORT GENERAL DIRECTORATE FOR NAVAL TRANSPORT Alexandru Serban CUCU - General Director Address: 38, Dinicu Golescu Str., sector 1, Bucharest, ROMANIA Tel. 0040 21 319 62 03 Fax 0040 21 319 61 06 E-mail naval4@mt.ro


Download ppt "The Danube River – Access way to Constantza Port The 4 th of October 2007, Budapest Monica Patrichi Expert Ministry of Transport General Directorate for."

Similar presentations


Ads by Google