Download presentation
Presentation is loading. Please wait.
Published byVincent Ford Modified over 9 years ago
1
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH 2014 Maryland Concrete Conference Kevin J. Sabolcik, P.E. Baltimore County DPW David Berkhimer Brawner Builders, Inc.
2
AN ECONOMIC APPROACH TO A SMALL BRIDGE REPLACEMENT PROJECT OR ‘BRIDGE ON THE QUICK & CHEAP’ DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION
3
Problem Analysis – Decision Process Design Construction Conclusion DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION
4
What is a project? A series of planned events undertaken in a systematic manner to achieve a specific outcome while balancing the constraints of schedule, cost and performance or quality. DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION
5
Existing Structure Built Circa 1920 Concrete Slab w/Encased Steel Beam Superstructure Concrete Abutments on Spread Footings 16’ Long Span, 20’ Clear Roadway, 24’ Out to Out Width
6
Bridge No. B-0427 Dairy Road Elevation DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION
7
Bridge B-0427 Dairy Road Approach
8
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION Interim Action
9
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION Structure Condition Overall Sufficiency Rating ≈ 38% Superstructure in Poor Condition Substructure in Satisfactory Condition Some Minor Lowering of the Stream Bottom along Abutments/Exposed Footings
10
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION Dairy Road Characteristics Rural Local Road (Northern Balt. Co.) Width Varied 16’ to 18” Tangential / Flat Alignment ADT ≈ 575 VPD/2% TRUCKS 30 MPH Design Speed No History Of Accidents At Site
11
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION Other Design Consideration Adjacent Overhead Utilities Soil Borings Indicated 10’ Silt/Sand Mix, 15’ Decomposed Rock then Rock No ROW beyond Existing Footprint USE III Waterway (10/1 to 4/30 Restriction)
12
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION Project Needs Need to Replace Deteriorated Structure Safety – Current Code (Loads, Widths, Barriers, etc.) Get In – Get Out – Stay Out
13
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION Project Wants Want to Avoid Right of Way Acquisition – Highest Priority Want to Minimize Permitting & Utility Issues – Secondary Priority Want Most Cost Effective Solution – Lowest Priority
14
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION Design Direction Leave Existing Abutments for Scour Protection & Minimize Stream Impacts Maintain Low Chord/Road Profile 24’ Clear Roadway Width (Design Exception Documented) Reinforced Precast Concrete Slabs Cast-in-Place Concrete Abutments on Micro-Piles.
15
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION
18
Performance Specification for Pile Foundation
19
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION
27
Conclusions Total Project Cost ≈ $500,000 Total Project duration < 12 Months Avoided ROW Issues by Discussing Project with Adjacent Property Owners Achieved Project Purpose
28
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION QUESTIONS??? Teamwork