Presentation is loading. Please wait.

Presentation is loading. Please wait.

Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, 2008. Copying permitted for purchasing institution.

Similar presentations


Presentation on theme: "Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, 2008. Copying permitted for purchasing institution."— Presentation transcript:

1 Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, 2008. Copying permitted for purchasing institution only. This material is not copyright free. Sash windows The box sash window is constructed with a frame and two sashes, with the top sash sliding down and the bottom sash sliding up. What is the sequence of operations for fitting a box sash window?

2 Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, 2008. Copying permitted for purchasing institution only. This material is not copyright free. The window board forms the finish or trim to the top of the inner leaf of the cavity wall, where it finishes at the window opening. What is the sequence of operations for fitting a window board? Window boards

3 Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, 2008. Copying permitted for purchasing institution only. This material is not copyright free. Stairs provide access from one floor to another. Each continuous set of steps running in one direction is called a flight. Can you name all the components labelled opposite? Stair terminology

4 Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, 2008. Copying permitted for purchasing institution only. This material is not copyright free. Can you list the sequence of operations for fitting a staircase? Stairs

5 Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, 2008. Copying permitted for purchasing institution only. This material is not copyright free. Studwork Timber studwork covers partitions or walls, usually of light construction, used to divide a building into compartments. What is the sequence of operations for fitting a timber stud?

6 Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, 2008. Copying permitted for purchasing institution only. This material is not copyright free. Plasterboard can be cut with a plasterboard saw when accuracy is needed, but for most jobs, a craft knife does the job more quickly. In what ways can plasterboard can be fixed? Plasterboarding

7 Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, 2008. Copying permitted for purchasing institution only. This material is not copyright free. Door frames are usually constructed from heavier material, with solid rebates; linings are generally lighter, with planted door stops. What is the sequence of operations for fitting a door lining? Frames and linings

8 Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, 2008. Copying permitted for purchasing institution only. This material is not copyright free. Grounds can be fixed in several ways, including screwing into timber or plastic plugs, using masonry nails and using adhesive. What is the purpose of lats? Grounds


Download ppt "Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, 2008. Copying permitted for purchasing institution."

Similar presentations


Ads by Google