DUBAI STAR WORK PROGRESS DATE 23 JULY 2014 1. Material At Site.

Similar presentations


Presentation on theme: "DUBAI STAR WORK PROGRESS DATE 23 JULY 2014 1. Material At Site."— Presentation transcript:

1 DUBAI STAR WORK PROGRESS DATE 23 JULY 2014 1

2 Material At Site

3 Concrete Pouring Work

4 Ceramic on 38 th floor Corridor Ceramic work at Balcony Ceramic Floor work at PantryUp stand at 34 th floor

5 Ceramic at Balcony Basement Panting works Basement Finishing work

6 Window Up stand at 31 st floor Stair Steps at 36 th Floor Stair Steps at 38 th Floor Mason work at 21 st floor

7 Concrete Work at SiteBalcony Floor Ceramic Electric Room Ceramic Floor Material At Site

8 Aluminum at Façade Material At Site