Public Works Department LoJack Recovery System for Heavy Equipment & Rolling Stock June 24, 2014
2
Background History Of Loss Selection Criteria Why LoJack? Sole Source Selection Process Installation Process Recommendation Presentation Outline
3
Background Orange County is 5 th largest municipality in the State of Florida The operational responsibility of Public Works requires a large inventory of heavy equipment and rolling stock Public Works Heavy Equipment & Rolling Stock –1100 Pieces of equipment –Valued at $42 M
4
Background Examples of Heavy Equipment Dozer $200,000 Tri-axle Dump Truck $140,000
5
Background Front End Loader $125,000 Backhoe $125,000
6
Background Dump Truck (6 Wheel) $75,000 Bobcat $35,000
7
National statistics indicate equipment theft is highest in: –States with many active construction projects –States with international borders or access to major shipping ports Construction in suburban regions are at higher risk Florida ranks 3 rd in the nation for equipment theft History of Loss
8
Orange County has experienced an average equipment loss of $77 K per year over the last five year Public Works equipment remains at work site overnight for efficiency
9
History of Loss Equipment is subjected to vandalism and theft Public Works in recent months has experienced the theft of 3 pieces of equipment totaling $175 K
10
History of Loss Discussions on methods for securing equipment were held with County Administration and other affected Departments in March 2014 Staff discussed a number of options Public Works and the Procurement Division determined Lo Jack as most cost effective option
11
Selection Criteria Vehicles/Equipment in high demand Replacement Cost Ease of removal Ease of disposal Impacts on project workloads Selection Results 504 Pieces of equipment – Value: $25 M
12
Why LoJack? Over 90% recovery rate One time cost-$325/unit (No Monthly Fee) Local, National and International Coverage Supported by Orange County Sheriff and Orlando Police Department & other municipalities 20-year history of success No service fees Self powered
13
Why LoJack? More cost effective than a GPS tracker/device Works in places where GPS does not Ruggedized device for heavy equipment and large vehicles Non-detectable wires
14
Sole Source Selection Process Lo Jack Quote received March 2014 Procurement Division posted a Sole Source Statement to determine if any other recovery system providers available Inquiry Posted on May 21, 2014 Closed June 2, 2014 No Responses
15
Installation Process Public Works Two-Tier Approach First Tier: Heavy Equipment and Large Rolling Stock ‒ 328 Pieces of Equipment ‒ Cost: $106,600 Second Tier: Rolling Stock ‒ 176 Pieces of Equipment ‒ Cost: $57,200 504 pieces of equipment - Value $25 M Total cost of LoJack - $163,800
16
Recommendation Approval of Purchase Order M68503, Purchase of LoJack Units in the award amount of $163,800.
17
Public Works Department LoJack Recovery System for Heavy Equipment & Rolling Stock June 24, 2014