Pennington WTW Review Meeting SWS, Crawley 8 April 1997
2
Ground Rules We must stay for the whole meeting - no interruptions! Please, no telephones! We are a Team - everyone is equal Everyone has an opportunity to speak No hidden agendas - no point scoring Constructive contributions only Don’t go away with any garbage at the end of the day!
3
Agenda Performance of the Team Design Resources Construction Resources Interfacing (Designer / Contractor) Interfacing (Civil / M&E) Duplication / Gaps Use and management of external bodies / agencies Drawings / change control /technical information Planning Application Site visits - Civil / M&E Designer matters: Control Building Geotechnical contribution As built drawings Commissioning Project phasing - roles and responsibilities Team Building
4
Outputs For each item on the Agenda: –Sponsor to explain –Discuss how it could have been better –Record conclusion.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.