Download presentation
Presentation is loading. Please wait.
Published byBrianna Atkinson Modified over 9 years ago
1
Public Hearings January 13, 2015
2
Case: PSP-14-05-132 Project: Avalon Park PD / Avalon Town Center PSP / A Portion of Tract 3 Uptown Avalon PSP Applicant: Dave Schmitt, Dave Schmitt Engineering, Inc. District: 4 Acreage:1.15 Request:Preliminary Subdivision Plan to construct 16 single-family residential dwelling units, of which 10 will contain office / retail units (11,760 SF of C-1 uses) on the ground floor. Avalon Park PD / Avalon Town Center PSP / A Portion of Tract 3 Uptown Avalon PSP
3
Zoning Map Avalon Park PD / Avalon Town Center PSP / A Portion of Tract 3 Uptown Avalon PSP Zoning Map
4
Avalon Park PD / Avalon Town Center PSP / A Portion of Tract 3 Uptown Avalon PSP Future Land Use Map Avalon Park PD / Avalon Town Center PSP / A Portion of Tract 3 Uptown Avalon PSP Future Land Use Map
5
Avalon Park PD / Avalon Town Center PSP / A Portion of Tract 3 Uptown Avalon PSP Aerial Map Avalon Park PD / Avalon Town Center PSP / A Portion of Tract 3 Uptown Avalon PSP Aerial Map
6
Avalon Park PD / Avalon Town Center PSP / A Portion of Tract 3 Uptown Avalon PSP
7
Proposed New COA #16 16. The construction plan submittal shall include a Traffic Control Signage and Stripping Plan for installation of stop signs at the project entrance on Tanja King Boulevard for review and approval by the County. District 4
8
Action Requested Make a finding of consistency with the Comprehensive Plan and approve the Avalon Park PD / Avalon Town Center – A Portion of Tract 3 Uptown Avalon PSP dated “Received October 23, 2014,” subject to the conditions listed under the DRC Recommendation in the staff report, with the addition of new COA #16. District 4
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.