Update on Q1 TAS REGION (18 to 22m), layouts. D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting1
2
Motivation. Reduce and improve interventions in view of LS3. Q1-TAS is a difficult access area, space is very limited and subject to high radiation doses (ALARA considerations). D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting2
3
3
4
4
5
Baseline lay-out Assumed BPM integrated into Q1. Bellows between Q1-TAS. Vacuum equipment inside FIN and at IP side (CMS cavern). D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting5 ST0666891 etude IP5L_version 1 vide cote IP5 ST0667188 Integration vers 1 proposition 1 ST0667348 Ligne vide cote Q1 version 1 CATIA models
6
Situation actuelle D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting 6 1447mm 990mm 1480mm
7
Quick connectors D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting 7
8
Situation actuelle D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting 8 430 mm 150 mm
9
D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting 9 Situation actuelle
10
D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting 10 Situation actuelle
11
Baseline scénario D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting 11
12
Baseline scénario D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting 12
13
Baseline scénario D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting 13
14
Baseline scénario: les 2 vannes coté IP (passage tuyauteries gaz + vide a l’exterieur du FIN) D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting 14
15
TAXS next steps, detail studies Vacuum Alignment (BP support) Installation Interventions, remote handling Risk assessment Timeline for LS2 needs to freeze lay-out during next year. D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting15
16
TAXN at P8 Timeline D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting16