UPDATE OF CAA CHANGES & PROPOSALS WHICH COULD AFFECT DESIGN DELEGATIONS Peter Gill Airworthiness Engineer Aircraft Certification Unit
2
Contents Update to changes proposed at last Delegation Seminar 2007 Delegation Issue Presentation Review of new STC process
3
Update to 2007 Change Proposals Major Design Changes – STC’s As announced at 2007 Seminar Limitation to prohibit major approvals “that changed data on the TCDS” Comments requested: No comments at all – assumed universal agreement
4
Update to 2007 Change Proposals Major Design Changes – STC’s Consistency with other authorities and proposed Rule change Limitation now proposed as “design change which is classified as major” Comments requested: Need mechanism to be able to approve “one- off” major changes Definition of “major” needs revision
5
Update to 2007 Change Proposals Major Design Changes – STC’s Limitation now proposed as “prohibit approval of design change which is classified as major without prior agreement of the CAA”. Agreement will be given promptly and at no cost where: CAA agrees it is appropriate for a “one-off” approval Not contrary to CAA policy
6
Update to 2007 Change Proposals Major Design Changes – STC’s Areas being looked at before policy can be introduced: Level at which CAA agreement to approve “one-off” major change is given (needs to be ACU level) Definition of Major Have looked at origin of current Rule Part 1 definition Want to introduce common definition with FAA/EASA Affects other areas of CAA Embodied in Rule Part 1 – Not easily changed Looking at new definition of Major Design Change
7
Design Delegation Issue Presentation Presentation available, covering: Purpose of a Design Delegation Part 21 – Approval of technical data Legal basis for Design Delegations Part 146 – Design organisations Design Delegation issue process
8
Review of New STC Process AC 21-8 introduced February 2009 Certification Project Plans (PSCP) Compliance testing Conformity inspections Flight Testing Note: STC applications already existing in February 2009 continue under old process
9
Review of New STC Process Certification Project Plans (PSCP) Need to be taken seriously and compiled carefully Get CAA agreement on Plan Should fully detail all areas delegated to Design Organisation or other third parties Should fully detail any areas where the proposed project differs from AC 21-8
10
Review of New STC Process Certification Project Plans (PSCP) Contd Specify Certification Basis Until a Changed Product rule is introduced to Part 21, AC 21-8 recommends using the latest certification basis If you are not proposing to use the latest Rule you should state why in the PSCP You can go to earlier amendment states for individual paragraphs where it is impractical to meet the latest requirements.
11
Review of New STC Process Compliance Testing Detailed Test Plans Test Loads Method of Application of Loads Measurement of Results (including Instrument Calibration) Verification of test set-up (Part 146 SOC) Witnessing of test (authorised by PSCP)
12
Review of New STC Process Compliance Testing Conformity inspections Test article definition Manufacturing documentation (Form One or equivalent) Conformity Certification (8130-9 signed by LAME for minor and IA for major design changes, or as specified in PSCP)
13
Review of New STC Process Flight Testing Specialised type of Compliance Testing Conformity inspection of Test article Special-Experimental airworthiness certificate for aircraft Test Pilot approval of Pilot (AC 19-1) Detailed Flight Test Plan
14
Any Questions?