RENOVATION & ADDITION OPTIONS TORONTO DISTRICT SCHOOL BOARD NORTH TORONTO COLLEGIATE INSTITUTE REDEVELOPMENT STUDY
2
GOALS AND OBJECTIVES Address insufficient space and facilities for contemporary and future curriculum Support specialized programs of NTCI Accommodate an additional 300 students Create regulation size track and field Provide ample parking Retain significant portion of existing building Provide barrier-free access
3
EXISTING SPACE INADEQUACIES Insufficient teaching space Inadequate space for music and drama programs Inadequate gymnasia space and change rooms Insufficient library space Insufficient computer labs Inadequate track and playing field Insufficient staff and visitor parking
4
REQUIRED ADDITIONAL PROGRAM AREAS 3 regular classrooms @ 2250 sq. ft. 3 science labs @ 4800 sq. ft. 4 seminar rooms @ 1600 sq. ft. 1 special education room @ 500 sq. ft. 1 music room @ 1600 sq. ft. 1 drama room @ 1700 sq. ft. 1 double gym @ 8000 sq. ft. spectator space – indoor and outdoor proper change rooms additional 1300 sq. ft. library space with windows 2 computer labs @ 2000 sq. ft. regulation size track and field additional parking spaces
5
SITE PLAN OPTION A RENOVATION PLUS ADDITION
6
SECTION OPTION A RENOVATION PLUS ADDITION
7
SITE PLAN OPTION B RENOVATION PLUS ADJACENT ADDITION
8
Demolish upper gym Build new double gym over existing @ 9000 sf Build roof over existing courtyard to accommodate new library @ 4000 sf Build third floor over existing west wing N-S LONGITUDINAL SECTION SECTION OPTION B RENOVATION PLUS ADDITION
9
N-S CROSS SECTION E-W CROSS SECTION SECTION OPTION B RENOVATION PLUS ADDITION
10
BASEMENT
11
FIRST FLOOR
12
SECOND FLOOR
13
THIRD FLOOR
14
COSTS – OPTION B Renovations and Additions Revenue from TDSB Revenue from Development (1 Tower) NET SHORTFALL $ 31.6 million None approved $ 7.4 million $ 24.2 million COSTS – OPTION A Renovations and Additions Revenue from TDSB Revenue from Development NET SHORTFALL $ 32.6 million None approved $ 0 $ 32.6 million
15
BUILDING AREAS TO MAINTAIN Existing Building174,000 sf New Building154,000 sf Renovation & Addition A200,000 sf Renovation & Addition B180,000 sf Note : due to building greater area, lack of insulation in existing envelope etc., ongoing costs (for cleaning, heating, cooling between 50% and 70% greater than new construction)
16
CONCLUSIONS Renovation and addition is more expensive than new construction Students required to leave site during construction and renovation Additional area created is expensive to maintain Minimum of 2 residential towers required to finance the renovation and additional area Neither option works on TDSB lands only Older infrastructure is less energy efficient
17
PRO’S All historic facades retained in situ - restored Embedded materials and energy retained Good quality existing construction wide halls, high ceilings, natural light
18
CON’S Field is not improved without demolishing and rebuilding existing auditorium at great expense Students need to leave the site during construction (1 year minimum) Both new and existing gym is still less wide and long than ideal Ongoing mechanical costs of a larger less efficient building Not economically feasible – insufficient funding
20
NEW SCHOOL OPTION TORONTO DISTRICT SCHOOL BOARD NORTH TORONTO COLLEGIATE INSTITUTE REDEVELOPMENT STUDY
21
LAND-USE “ TEST FIT “ PROCESS Purpose – to study ways to replace NTCI with enough residential development on the site to make up the funding shortfall To do this in a manner that meets the goals and objectives of the school and the community Workshop process involving students, teachers, alumni, community members, board representatives and the design team Defined goals and objectives Look at a wide range of options as a group and suggest a land- use concept plan which best meets the objectives Early feasibility stage
22
GOALS AND OBJECTIVES A clear sense of identity for each school Access to natural light and view for the school and residential buildings A full playing field and track Facilities that fully support the needs of the students Public access to the schools public spaces including the playing field, gym and auditorium Ample green space Limit overshadowing of playing field and neighbourhood Key objective: The excellence of the school’s programs should be reflected through the excellence of the design
23
AERIAL VIEW
24
SITE OPTIONS A wide range of siting options were studied Group selected the one that best met the established goals and objectives
25
SITE PLAN
26
FIRST FLOOR
27
AERIAL VIEW SECOND & THIRD FLOORS
28
FOURTH FLOOR
29
ACADEMIC DESIGN RATIONAL A building with “ public presence “ Regulation size track and field North /south orientation of field Increased parking for each school – improved traffic flow Sustainable design – energy efficient construction, day lighting, living roofs, storm water retention Phased construction so NTCI may remain on site
30
triple gymnasium state of the art auditorium accessible to the public full size library improved change room and weight room facilities fully wired classrooms with latest technology additional music rooms and drama space additional science labs access to swimming pool additional computer rooms high quality building which reflects the excellence of the academic program of the school elements of existing building will be incorporated into the design of the new school ACADEMIC DESIGN RATIONAL CONT’D Improved facilities: Design quality: Heritage preservation:
31
COMMUNITY DESIGN RATIONAL Maximum green space preserved at grade Green space is connected to both Broadway and Roehampton Accessible and safe Public arcade connection north / south through site Low overall density ( less than 3 times coverage) Increased parking provided on the site Removal of unsightly on grade parking lots and garbage pick up Thinner buildings preserve light and view
32
COMMUNITY DESIGN RATIONAL CONT’D Residential buildings expressed as neighbours, not placed on top of the school Amenity space provided for each residential building on its own site – roof garden, pool Limits future site development to potentially 2 residential buildings Well defined public spaces – including street and open spaces
33
PRO’S Full size track and field open to both streets Well defined public space Clear identity for all components High quality facilities for students Rentable facilities – auditorium, gym, field Double height library Triple gym possible with moveable partitions High quality auditorium – view to court Wired environment – latest technology Sustainable design – energy efficiency, living roofs, storm water retention, daylighting (less energy and maintenance costs) Well organised w/ centrally focussed plan Generous lobby space and spaces for student gathering Design can be customised to address needs of NTCI’s students Access to natural light and ventilation
34
CON’S Loss of existing building Some new classrooms smaller than old classrooms