Presentation is loading. Please wait.

Presentation is loading. Please wait.

PDR: 2/7/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.

Similar presentations


Presentation on theme: "PDR: 2/7/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni."— Presentation transcript:

1 PDR: 2/7/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni

2 Action Items Generator – Model 443541 Generator – Model 443541 Capable of functioning in best case scenario Capable of functioning in best case scenario Smaller model unable to handle > 2.5 A for worst case scenario Smaller model unable to handle > 2.5 A for worst case scenario Website Website Used template found online Used template found online Ready for regular updates with ease Ready for regular updates with ease

3 Website: Before and After

4 Current Status Decided on Drag-Based Design Decided on Drag-Based Design Based on building abilities Based on building abilities Designing airfoils would be difficult on budget/time Designing airfoils would be difficult on budget/time Not trying to reinvent the wind turbine Not trying to reinvent the wind turbine On-schedule On-schedule

5 Next Week’s Action Items Group Concept Group Concept Finalize concept and complete report Finalize concept and complete report Start CAD drafts Start CAD drafts Create a Bill of Materials Create a Bill of Materials Look for prices on various items Look for prices on various items Batteries Batteries Materials for frame/base Materials for frame/base

6 Questions? Questions?


Download ppt "PDR: 2/7/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni."

Similar presentations


Ads by Google