Presentation is loading. Please wait.

Presentation is loading. Please wait.

CUREe Woodframe Project Task 1.4.1 - Anchorage of Woodframe Buildings Hillside Connection Tests Meeting, January 12-13, 2001 Principal Investigator Yan.

Similar presentations


Presentation on theme: "CUREe Woodframe Project Task 1.4.1 - Anchorage of Woodframe Buildings Hillside Connection Tests Meeting, January 12-13, 2001 Principal Investigator Yan."— Presentation transcript:

1 CUREe Woodframe Project Task 1.4.1 - Anchorage of Woodframe Buildings Hillside Connection Tests Meeting, January 12-13, 2001 Principal Investigator Yan XIAO, Ph.D., PE. Yan XIAO, Ph.D., PE. Researchers: Dr. L. Xie University of Southern California

2 Program Meeting Project Meeting at USC on May 16, 2000 b b Nicolino G. Delli Quadri (LA DBS) b b Steve Pryor (Simpson Strong-Tie) b b Jim Russell b b Vida Tarasyoly (Rubicon) b b Chia-Ming Uang (UCSD) b b Yan Xiao (USC) b b Li Xie (USC)

3 Cyclic Testing of Anchors n To experimentally define the hysteric characteristics of primary and secondary anchors n To identify the failure modes To develop and calibrate analytical models for base level diaphragm design of hillside buildings To develop and calibrate analytical models for base level diaphragm design of hillside buildings

4 Test Matrix

5 Specimen: Primary Anchor, HD15

6 Specimen: Secandary Anchor, HD5

7 Test Setup

8 Instrumentation

9 Loading Program

10 Preliminary Test Results: PHD5

11 Preliminary Test Results: HD5

12 Anchor Brackets

13 Hysteresis Loops: PHD5

14


Download ppt "CUREe Woodframe Project Task 1.4.1 - Anchorage of Woodframe Buildings Hillside Connection Tests Meeting, January 12-13, 2001 Principal Investigator Yan."

Similar presentations


Ads by Google