Managing informal aspects of decision processes for improving reactivity of industrial systems Aline CAUVIN, Riad MEGARTSI DIAM-IMS Domaine Universitaire de St-Jérôme Avenue Escadrille Normandie-Niemen 13397 MARSEILLE CEDEX 20 FRANCE
2
Control system of the firm Production process Idea of product Process models Product models Raw material Finished product Controlling enterprise processes Objectives & constraints Quality, cost, time Objectives & constraints Quality, cost, time Objectives & constraints Quality, cost, time Design control system Production control system Design process Problematics ( 2 )Proposals ( 6 )Implementation ( 5 )
3
Defining enterprise processes Modelling enterprise processes Elaborating common representation Defining mechanisms to process disturbances Analysing disturbances Modelling reaction processes Modelling communication networks between actors Designing a support to aid enterprise processes control An approach in disturbed context Problematics ( 2 )Proposals ( 6 )Implementation ( 5 )
4
Analysing processes in usual context Input Code Verb Human resources Technical resources Type (S, I, E) Performance Indicators quality cost time required effective Output Problematics ( 2 )Proposals ( 6 )Implementation ( 5 )
5
Detecting disturbance Reaction process to disturbances Actor ReactingCharacterizingClassifying Identifying Storing Tool for analysing disturbances Disturbance classification Actor relay Representation of decision making processes Problematics ( 2 )Proposals ( 6 )Implementation ( 5 )
6
Disturbance classification : an example Problematics ( 2 )Proposals ( 6 )Implementation ( 5 ) CriteriaCategories Frequency Importance Causality Control Low : disturbance seldom occurs Medium : disturbance occurs from time to time High : disturbance often occurs Low : consequences of disturbance are not important for production system or its control Medium : production plans may be modified High : consequences of disturbance are important or sometimes catastrophic for production First : causes of disturbance are identified Second : causes are consequences of previous disturbances. It is necessary to identify initial causes Total : disturbance is completely controlled Partial : disturbance is not completely controlled but reaction rules are available and usable No control : there are no algorithms, rules or methods to face disturbance
7
Disturbance Representation of actor relay Project manager Production manager Dialogue relationship Operator Quality manager Formal communication Informal communication Order (1) (4) (3) (2) (0) Problematics ( 2 )Proposals ( 6 )Implementation ( 5 ) Dialogue relationship Order Formal communication Informal communication
8
Identified Disturbance Modelling reaction processes Normal functioning Normal functioning Disturbed functioning Process Flow / Defining involved actors Processed Rejected solution Selected solution Process Flow / Selecting solutions Problematics ( 2 )Proposals ( 6 )Implementation ( 5 ) Resolved disturbance Process Flow / Performing solutions
9
disturbance Actor involved Control aided support Problematics ( 2 )Proposals ( 6 )Implementation ( 5 ) Informing Deciding Storing Functions Updating Solving Solving rules Database Consulting Identifying Consulting Disturbance database New disturbance Classifying
10
Implementing our approach : an example Mechanical engineeringElectronic engineering Computer engineering Prototype Conceptual elaboration Virtual/physical modelling Evaluation of Concepts Definition of technical specifications Detailed design Prototyping EE ME Coordination information exchanges Decision making Conceptual elaboration Virtual/physical modelling Evaluation of Concepts Definition of technical specifications Detailed design Prototyping Problematics ( 2 )Proposals ( 6 )Implementation ( 5 ) disturbances
11
Problematics ( 2 )Proposals ( 6 )Implementation ( 5 ) Design process
12
Problematics ( 2 )Proposals ( 6 )Implementation ( 5 ) Actor relay Project manager Customer Supplier Technician 0 1 Manager of electronics Dpt Manager of mechanics Dpt Purchasing officer Sales executive 2 5 8 9 9 9 9 4 10 11 External Environment Internal Environment Computer manager Disturbance 6 7 3
13
Problematics ( 2 )Proposals ( 6 )Implementation ( 5 ) Reaction process Integration performed Integration validated Process Flow/ Testing intégration Integration nonvalidated Soft re-programmed Process Flow / Selecting solution Goto / Designing Soft Assemblying E&S Goto/ / Integrating Changed chip Not available Ordered Received / Process Flow / Selecting supplier Process Flow / Requesting component Available Goto Integrating
14
Problematics ( 2 )Proposals ( 6 )Implementation ( 5 ) Proposal for improving actor relay Project manager Customer Supplier Technician 0 1 Manager of electronics Dpt Manager of mechanics Dpt Purchasing officer Sales executive 2 4 2 2 2 2 6 7 Computer manager Disturbance 3 5
15
Management of reactions to disturbances Analyzing and characterizing disturbances to evolve reactions Capitalizing decision processes in order to reuse them for future reactions To conclude : interests of the approach Improving structure and functioning of industrial organizations Improving knowledge management Improving communication between actors