Download presentation
Presentation is loading. Please wait.
Published byErica Warren Modified over 9 years ago
1
Omar Seguna
2
QUALITIES OF A PROJECT non-routine tasks novel approaches or techniques degree of planning phased timescales commissioned various specialties work resources pre-defined large-scale/high sophistication
3
progress is not always visible abstraction plays a central and permeating role in terms of cost s/w products are more complex than traditional ones deals in subjectivity have to contend with conflicting or ill-formed requirements. Is always expected to accomodate the physical components of a system SOFTWARE PROJECT
6
Option analysis (goal aspect) Risk management (probability aspect) Milestone setting (product aspect) Scheduling e.g. Pert chart PROJECT PLANNING TECHNIQUES
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.