TECHNICAL REVIEW Initiated a review on the Abandonment and Restoration Plan of the Lupin Mine: –conducted August through October 2001. Team Members: –EBA.

Similar presentations


Presentation on theme: "TECHNICAL REVIEW Initiated a review on the Abandonment and Restoration Plan of the Lupin Mine: –conducted August through October 2001. Team Members: –EBA."— Presentation transcript:

1

2 TECHNICAL REVIEW Initiated a review on the Abandonment and Restoration Plan of the Lupin Mine: –conducted August through October 2001. Team Members: –EBA Engineering Consultants; and, –Robertson GeoConsultants.

3 TECHNICAL REVIEW Objective: –Clarify technical feasibility of existing reclamation plan; and, –Initiate the process of determining viability of alternative restoration/reclamation methods.

4 TECHNICAL REVIEW Focused on: –Geothermal/geotechnical; and, –Geochemical database

5 TECHNICAL REVIEW Existing Reclamation Plan: –Flooding of areas that are currently used for water retention;and, –Mechanical covering of higher elevation tailings cells with esker material.

6

7

8

9

10

11 TECHNICAL REVIEW Review of Geothermal Data: –Extensive database; –Mine is located in area of continuous permafrost; –Mean annual ground temperatures, -6 0 C - 8 0 C; –Active layer thickness ranges from 1.0 m (undisturbed terrain) to 4.0 m (exposed bedrock).

12 TECHNICAL REVIEW Geothermal Data: –Reclaimed Tailings Cells; Frozen year round except for seasonal thaw; Active layer thickness ranges between 1.5-2.0 m; Thickness of active layer dependent upon amount of cover; Active layer typically penetrated 1.0 m into underlying tailings; and, Temperatures in inactive cells below 10 m depth ranged between -3.5 0 C to -7.5 0 C.

13 TECHNICAL REVIEW Review of Geochemical Data: –Extensive database; –Tailings characterized by high sulphide content and low neutralization capacity; and, –Exhibit a tendency to become acid generating.

14 TECHNICAL REVIEW Geochemical Data: –Data limitations; Lack of concrete geochemical data characterizing pore water from active layer; and, Presence and extent of potential impacts resulting from pore water are unknown at this time.

15 TECHNICAL REVIEW Reclamation Options: Consistent with industry accepted practices; Cover option will limit but not entirely prevent ingress of oxygen into underlying tailings; Proposed cover option will not prevent thaw penetration into tailings; Cover thickness of 1.75 m results in an active layer between 0.5 m to 1.5 m thick;

16 TECHNICAL REVIEW Reclamation Options cont’d: Geochemical impacts of seasonal freeze-thaw cycles on tailings material are not well known; Cover thickness of 1.0 m would result in an active layer of approx. 2.0 m thick; Thinner cover thickness, potential viable alternative to existing reclamation plan using 1.75 m of cover; and, Total encapsulation of tailings with permafrost is possible but not technically feasible.

17 TECHNICAL REVIEW Conclusions: –Excellent database; –Reclaimed tailings are frozen the majority of the year; –An esker material cover assists in limiting oxygen availability to the tailings; –Cover concept assists with maintaining tailings in a frozen condition;

18 TECHNICAL REVIEW Conclusions cont’d: –Current reclamation option is insufficient to fully encapsulate tailings within permafrost; –Total encapsulation of tailings in permafrost may not be technically feasible; –Covers of 1.0 m thickness or less may be a viable reclamation option; –Datagaps need to be addressed before a final reclamation option and plan can be selected.

19 TECHNICAL REVIEW Next Steps: –Geochemical Field Study; Active and inactive tailings deposition cells; Concentrate on active layer characterization; Comparison of data collected with existing data (column tests); and, Recalculate water balance of tailings containment area to assist in mass balance calculations.

20 TECHNICAL REVIEW Next Steps: –Analyses Required; Pore water chemistry; Time Domain Reflectometry (TDR) tests; Whole rock chemistry; Acid Base Accounting (ABA) analyses; Leachability tests; Water analyses; and, Chemistry of water samples from ponded water and discharge stream.

21 TECHNICAL REVIEW Next Steps: –Geotechnical Study; Confirmation modeling of active zone thickness with various cover options.

22 TECHNICAL REVIEW –TO ENSURE THE INTEGRITY OF THE NATURAL ENVIRONMENT AFTER MINE CLOSURE

23

24

25

26


Download ppt "TECHNICAL REVIEW Initiated a review on the Abandonment and Restoration Plan of the Lupin Mine: –conducted August through October 2001. Team Members: –EBA."