Large Data Centers Small & Medium Data Centers Computer Rooms & Closets Network-Critical Physical Infrastructure Presented by Ian P. de la Rosa Enterprise District Manager APC Philippines
2
© 2003 APC corporation. Agenda About APC Network-Critical Physical Infrastructure investment and their Imperatives Maximizing the performance of your investment Availability Agility TCO Next Step
3
© 2003 APC corporation. CIO Priorities: Top Initiatives Question: Which of the following technology initiatives are important to your organization …. Source: Survey by Ziff Davis Media # 1: Business Continuity & Downtime Prevention / Increased Availability
4
© 2003 APC corporation. Is Your Company experiencing these trends? Rapid changes in IT technology Regulatory requirements Increasing availability expectations High operating/service costs High density Server consolidation In response, APC is changing the way the world designs, installs, operates, manages and maintains Network- Critical Physical Infrastructure (NCPI). What is NCPI?
5
© 2003 APC corporation. What is Network Critical Physical Infrastructure (NCPI)? The facility, physical support, power, and cooling for Information Technology NCPI consists of: Power (UPS, Power Distribution) Air (Air Conditioners, Air Distribution) Rack (Enclosures, Cable Mgmt, etc.) Management (common platform) Services (professional & break/fix) Data Centres or “IT Rooms” could be as small as an oversized closet or as large as a 100,000 square foot facility!
6
© 2003 APC corporation. Essential foundation of reliability Network-Critical Physical Infrastructure (NCPI)
7
© 2003 APC corporation. Lifecycle Costs Adaptability/Modularity/Scalability Availability/Redundancy Manageability Serviceability NCPI Challenges
8
© 2003 APC corporation. 1.Optimize capital investment and available space 2.Accelerate Speed of deployment 3.Lower the cost of Service contracts Lifecycle Cost / Economics Challenges …
9
© 2003 APC corporation. Average Utilization of NCPI Forecasted capacity does not equal actual demand Over sizing results in lost capital & operating $$ Data centers are everbuilt to the most optimistic future needs that may ever be realized
10
© 2003 APC corporation. 4.Plan for a Power Density that is increasing and unpredictable 5.Adapt to ever changing environments 6.Vendor Neutral Mounting Adaptability/Modularity/Scalability Challenges …
11
© 2003 APC corporation. Power and Cooling requirements going up
12
© 2003 APC corporation. Heat Density Trends Source: The Uptime Institute - Reprinted with permission from a White Paper titled “Heat Density Trends in Data Processing, Computer Systems, and Telecommunications Equipment” v1.0
13
© 2003 APC corporation. 7.Minimize Human Error 8.Minimize points of failure between NCPI and the critical load 9.Reduce failure points that drop customers simultaneously 10.Eliminate Hot Spots Availability Challenges …
14
© 2003 APC corporation. Case Study of Downtime Failures Consistent with Surveys which attribute 60% or more of failures to Human Error
15
© 2003 APC corporation. Challenges …
16
© 2003 APC corporation. 11. Monitor Attributes at the Rack level 12. Provide predictive failure analysis Manageability Challenges …
17
© 2003 APC corporation. Challenges …
18
© 2003 APC corporation. 13. Decrease mean time to recovery 14.Simplify the complexity of the system Serviceability Challenges …
19
© 2003 APC corporation. Frequent IT changes create chaos resulting in human error They were not planned at all These systems were not planned to look like this
20
© 2003 APC corporation. The Business Value Equation for Network- Critical Physical Infrastructure Availability Agility TCO Value x = To Achieve Higher Business Continuity…
21
© 2003 APC corporation. Availability Agility TCO Value x = Equipment Reliability Mean-Time-To-Recover Human Error
22
© 2003 APC corporation. Standardization enables improved availability Modularize Pre-test systems in the factory Hot swappable Pre-Integrate Power- Cooling-Rack Management & diagnostics One-Time Engineering Unique training requirements On-site assembly On-site testing Custom programming StandardizeTo Eliminate Standardization accelerates learning at all levels, reducing human error and increasing availability
23
© 2003 APC corporation. Availability TCO Value x = Speed of Deployment Ability to Scale Ability to Reconfigure Agility The inherent ability to scale due to our modular approach to NCPI allows rightsizing, lower upfront cost and react to changing business requirements..
24
© 2003 APC corporation. Traditional Approach (3-6 Mo.) Design Concept Construction Design Construction Commissioning Operation Custom Parts, Applications and Services “I need more capacity.” “I have more capacity.” Needs Assessment
25
© 2003 APC corporation. The Design Concept is built on standardized parts that can be scaled to meet the need? Construction Design incorporates a “Lego Block” approach of pre-engineered components? Construction is mainly done in a factory instead of on-site? Commissioning tests pre-integrated infrastructure systems. It should be that …..
26
© 2003 APC corporation. Availability Agility TCO Value x = Capital Cost Electricity Costs Service Costs Oversizing is the dominant contributor…
27
© 2003 APC corporation. Waste due to over sizing Reference: APC White paper #37
28
© 2003 APC corporation. Reduced waste due to rightsizing
29
© 2003 APC corporation. The Business Value Equation for Network- Critical Physical Infrastructure Availability Agility TCO Value x =
30
© 2003 APC corporation. On-Demand Architecture for Network Critical Physical Infrastructure Changing the way the world designs data centers… InfraStruXure™ Symmetra PX InfraStruXure PDU NetShelter VX NetworkAIR FM Wiring Closets (1-3 Racks) Small Data Centers (5-20 racks) Smart-UPS NetShelter VX NetworkAir PA InfraStruXure TM Computer Rooms (1-5 Racks) Symmetra RM NetShelter VX NetworkAir PA Symmetra PX InfraStruXure PDU NetShelter VX NetworkAIR FM Medium Data Centers (20-100 racks) Large Data Centers (>100 racks) Symmetra MW InfraStruXure PDU NetShelter VX NetworkAIR FM InfraStruXure ™ for:
31
© 2003 APC corporation. After Before
32
The next step… For the next project, challenge your team to: Dramatically increase availability Do it in half the time Right size to the current requirement Make sure it can adapt To help you, we can team with your staff to: Survey opportunities for savings Develop options for increased availability Deliver scalable systems on short notice that minimize over-sizing
33
Questions?