ETA Environmental Health and Safety Monthly Metrics December, 2014
2
ETA Accidents- 12/14 TypeDateDept.DescriptionSeverityStatus No ETA accidents reported in December
3
ETA Accidents- By Type
4
ETA Accidents- Severity
5
Emergency Incidents- 12/14 DateIncidentAreaStatus There were no ETA reported emergency incidents in December
6
Ergonomic Assessments- By Month
7
Open EETD Ergonomic Assessments Date Requested Dept.TypeStatus 12/16/14ESDRMoveAssigned 12/16/14ESDRPreventativeAssigned 11/25/14DIVPreventativeActions Pending 11/4/14EAEIDiscomfortActions Pending 10/29/14EAEIDiscomfortActions Pending 10/10/14EAEIDiscomfortActions Pending 8/26/14EAEIPreventativeActions Pending
8
ETA Job Hazard Analysis (JHA)- Pending New Hire vs. Expired Metric Started Sep ‘13
9
Job Hazard Analysis- % Completion
10
ETA Incomplete Training Assignments * Does not include SEC0203 “External Monitoring” Notice or “FSM” courses
11
Training % Completion Status
12
Incomplete Training by Course Type (Total Incomplete Assignments = 75)
13
Training Assignments Due (Total = 75) Open Assignments by Dept.Open Assignments by Hire Date
14
ETA Training Assignments Due
15
Electrical Equipment Inspection Failure Status (Red Dot) Equipment listed in the EEIP database as “failed” and requires repair prior to use.
16
ETA Failed Electrical Equipment Status (1/5/15) EquipmentDate Days Failed Dept.AreaStatus Fixture Current Sensor1/9/092187BTUS46-231Unable to locate unit Waveform Generator4/7/111369BTUS46-115Unable to locate unit Dual Seal Vacuum Pump4/27/111349EAEI63-101Unable to locate unit Aethalometer4/28/111348EAEI63-101Unable to locate unit AC Line Conditioner6/6/12943EAEI70-278Power cord needs to be replaced Blower6/11/12938EAEI70-289Power cord needs strain relief Appliance Monitors10/18/12809ESDR90-1141Units may never have been built. Request closure. Tracer Emitter Units (Multiple)11/20/12776BTUS70-217Units placed out of service Particle Samplers (multiple units)2/5/13699EAEI71-106Units placed out of service Spark Ignition Unit10/3/13459BTUS70-173Unable to locate unit Residential Furnace10/18/13444BTUS70-173Unit being used for parts Turbine Meter Readout10/21/13441BTUS70-173Unable to locate unit Pressure Transducer Power Supply10/21/13441BTUS70-173Unable to locate unit MFC Pump12/2/13390EAEISactoWaiting for pump to be brought back from field Power Supply #111/7/1459EAEI70-278Uncovered AC terminal strip Power Supply #211/7/1459EAEI70-278Power cord needs replacement Power Supply12/10/1426ESDR70-173Unlanded conductors, ground bond not attached
17
Safety Concerns Submittals- ETA
18
ETA Safety Concerns Status #DateConcernTypeStatus 10345/5/14Surface of B90 4 th floor walkway is uneven where meets exterior stairway. Trip hazard. Building Maint. Open- Work Request #WIM577 11809/23/14Need steps from B90 shuttle stop up to sidewalk. Uneven surface. Traffic- PedCATS submitted for funding 118910/22/14Poor lighting near B90 stairwaysBuilding Maint. Open- Assigned to Facilities 119811/22/14Trash bin located at B63 is causing damage to exterior water pipe. Also blocking access ramp. Building Maint. Open- Facilities needs to find a new location.
19
Corrective Action Reports (CATS)- 12/14 CAT #DateDescriptionLeadStatus 96757/29/14Seismically secure the laser table near the 70-157 entrance. DOE assessment follow-up item. X. MaoFacilities work request submitted for cost estimate. 96868/18/14Improve Chemical Management System (CMS) input in 70-295 V. BattagliaCMS updated during recent self-assessment. Need to train proxies. Due 10/31/14. 97069/9/14Ensure air changes in 70-174 meet fire code requirements S. SynarskiFacilities work request submitted. Cannot close until FWR is completed by Facilities. Due 11/28/14.
20
Activity Hazard Documents (AHD)- 12/14 AHDDescriptionStatusLocationPI 3947Chemical- LithiumDraft: New AHD in development for glove box 70-291E. Cairns 3963Chemical- HydrogenDraft: New AHD in development for permeation device 70-143A.Weber 3964Chemical- ChlorineDraft: New AHD in development for 100ppm chlorine use 70-103R. Chen 3509Laser/X-RayDiscontinued70-163V. Zormpa
21
Audits and Inspection Status- 12/14 TypeDateLeadStatus Quarterly SAA Inspections 1/15R. ScholtzScheduling last week of January Management Electrical Safety Walkthrough 12/1/14 B62- TBD A. Gadgil12/1/14 walkthroughs completed. Additional walkthroughs of B62 need to be scheduled.
22
Significant Safety Achievements- 12/14 Continue set-up of Work Planning and Control (WPC) projects/activities for ESDR. I have participated in multiple reviews of the draft LBNL Electrical Safety Manual (ESM). I completed a three-day NFPA 70E electrical safety training course. The chemical container/sample clean-out of the B62 (Kerr) lab areas continues. Assisted with the glove box decontamination/decommissioning in B62-246. The December ETA Safety Committee meeting was completed.
23
Short Term Safety Outlook- 1/15 Continue the set-up of the Work Planning and Control (WPC) “projects” and “activities” framework for ETA. We are focusing on completion of ESDR activities first. Start the Glove Box Operation Self-Assessment project. Complete the management electrical safety walkthroughs of Building 62. Follow-up on electrical equipment issues identified from ETA electrical safety management walkthroughs. Complete the quarterly SAA hazardous waste inspections. Assist with the set-up for new lab areas 70-143, and B33 JCESR. Continue old chemical/sample clean-outs in 62-220, 62-246, and 62- 105 chemical closet. Continue to address issues identified by the fire marshal in ETA lab areas.