2 BRIDGE CONSTRUCTION PROJECTS

3 Consists of: –10 Year Capital Construction Projects – Annual Maintenance Projects

4 Funding Sources Construction Type Construction Costs 2010/2011 CONTRACTS TO BE AWARDED

5 2010 - CONTRACTS TO BE AWARDED Bridge Construction Projects NUMBER OF CONTRACTS 3 1 2 4 CONTRACT DESCRIPTION BRIDGE WIDENING & REHABILITATION BRIDGE DECK RECONSTRUCTION BRIDGE REPLACEMENT BRIDGE PAINTING BRIDGE SECURITY BRIDGE REPAIRS & RESURFACING CONSTRUCTION ESTIMATE $ 145 M $ 85 M $ 15 M $ 6 M $ 60 M $ 35 M TOTALS = $ 346 M

6 2010 - CONTRACTS TO BE AWARDED Bridge Construction Capital Projects T100.147 - Repainting Structural Steel, Structure Nos. 84.24 N & S – 1 st Quarter 2010 T100.034 - Bridge Deck Reconstruction, Miscellaneous Structural, Roadway and Lighting, Improvements, Milepost N0.00 to N3.00 – 1 st Quarter 2010 A100.183 – TPK/GSP Major Bridge Perimeter Security & Access Restriction Improvements – 3 rd Quarter 2010 P100.124 - Replacement of the Watchung Avenue Bridges at Milepost 152.4 – 4 th Quarter 2010 P100.132 - Widening and Rehabilitation of the Patcong Creek Bridge at GSP Milepost 31.0 – 4 th Quarter 2010 P100.130 - Widening and Rehabilitation of the Bass River Bridge at Milepost 51.9 - 4 th Quarter 2010 P100.025 – Rehabilitation of the Mullica River Bridge at Milepost 49.0 - 4 th Quarter 2010 A100.XXX – TPK/GSP Bridge Security Improvements, CM/GC – 4th Quarter 2010

7 2010 - CONTRACTS TO BE AWARDED Bridge Construction Annual Maintenance Projects T100.106 - Bridge Deck Repairs and Resurfacing, Milepost 83 to 122 and the NB- HCE – 4 th Quarter 2009 P100.079 - Bridge Repairs and Resurfacing, Milepost 0 to 126 – 4 th Quarter 2009 T100.107 - Bridge Repairs and Resurfacing, Milepost 0 to 122, the NB-HCE and the PHMTE – 1 st Quarter 2010 P100.108 - Bridge Repairs and Resurfacing, Milepost 126 to 172 - 1 st Quarter 2010

8 2011 - CONTRACTS TO BE AWARDED Bridge Construction Projects NUMBER OF CONTRACTS 2 1 2 1 4 CONTRACT DESCRIPTION BRIDGE DECK RECONSTRUCTION BRIDGE PAINTING BRIDGE SECURITY SPECIALIZED STRUCTURAL REPAIRS BRIDGE REPAIRS & RESURFACING CONSTRUCTION ESTIMATE $ 170 M $ 25 M $ 60 M $ 10 M $ 35 M TOTALS = $ 300 M

9 2011 - CONTRACTS TO BE AWARDED Bridge Construction Capital Projects T100.137 - Easterly Hackensack River Bridge Deck Reconstruction, Structure No. E109.83 – 1 st Quarter 2011 P100.132 – Substructure and Pile Repairs – 1 st Quarter 2011 T100.125 - Bridge Deck Reconstruction And Miscellaneous Improvements, NB-HCE, Milepost N6.00 to N8.20 – 2 nd Quarter 2011 P100.XXX - Repainting Structural Steel, Structure Nos. 127.2N – 2 nd Quarter 2011 A100.XXX – Bridge Security A100.XXX – Bridge Security, CM/GC

10 2011 - CONTRACTS TO BE AWARDED Bridge Construction Annual Maintenance Projects T100.XXX - Bridge Deck Repairs and Resurfacing, Milepost 83 to 122 and the NB- HCE – 4 th Quarter 2010 P100.XXX - Bridge Repairs and Resurfacing, Milepost 0 to 126 – 4 th Quarter 2010 T100.XXX - Bridge Repairs and Resurfacing, Milepost 0 to 122, the NB-HCE and the PHMTE – 1 st Quarter 2011 P100.XXX - Bridge Repairs and Resurfacing, Milepost 126 to 172 - 1 st Quarter 2011