Download presentation
Presentation is loading. Please wait.
Published byMelvin York Modified over 9 years ago
1
platform for the implementation of NAIADES www.naiades.info
2
platform for the implementation of NAIADES European Hull Database Andreas Bäck Deputy Project Coordinator of PLATINA
3
33 Agenda Overview of PLATINA Overview of European Hull Database Reflection group on inland navigation
4
44 Agenda Overview of PLATINA Overview of European Hull Database Reflection group on inland navigation
5
5 PLATINA … is a project within the 7 th Framework Programme for Research, Technology Development and Demonstration is aimed at coordinating and supporting research activities and policies runs from 06/2008 to 05/2012 consists of 22 partners from 9 different countries is organised around the five NAIADES action areas is strategically guided by key industrial stakeholders, associations and Member States administrations
6
6
7
7 Work package leaders Work PackageWP Leader WP1 Marketsvia donau (Austria) WP2 FleetVoies navigables de France (France) WP3 Jobs & SkillsBundesverband der Deutschen Binnenschiffahrt (Germany) WP4 ImagePromotie Binnenvaart Vlaanderen (Belgium) WP5 InfrastructureDienst Verkeer and Scheepvaart (Netherlands) WP6 Technical Secretariatvia donau (Austria)
8
8 Achievements until 06/2010 Launch of European IWT information portal (www.naiades.info)www.naiades.info online version of the IWT Funding Guide in EN, FR, NL, DE (www.naiades.info/funding)www.naiades.info/funding Good practice report I+II for the sector Launch of an IWT innovation database IWT strategic research agenda I IWT education and training institutes and curricula Preparation of organisational structure and support for the foundation of a European IWT educational network (EDINNA) Analysis of the reputation of IWT and definition of the desired image Brand essence summary Training workshop on integrated waterway planning Technical Specification for the Inland Electronic Navigational Chart (IENC) Register and digital parts of IENC standard Release of RIS community portal
9
9 Further activities in 2010 Extension and update of the IWT information portal Draft strategy for harmonised IWT education and training standards in inland navigation (STCIN) Work programme for the European IWT educational network (EDINNA) IWT lead event on 30.11/1.12.2010 in Brussels Strategic positioning of IWT’s reputation Work programme of promotion & development agencies Development of a strategic communication agenda Inventory of strategic inland waterway projects RIS reference data management systems Publication of a best practice manual on waterway infrastructure planning following the Joint Statement
10
10 Agenda Overview of PLATINA Overview of European Hull Database Reflection group on inland navigation
11
11 Main Objectives of European Hull Database Implement and operate pilot service to facilitate hull data exchange as indicated by Directive 2006/87/EC, RheinSchuO and Commission Regulation for Electronic Reporting Prepare scenarios for full scale operation (2012 onwards)
12
12 Data to be processed (1/2) A. All crafts (according to 2008/87/EC and RheinSchuO) 1.Unique European Vessel Identification Number 2.Name of the craft/vessel 3.Type of craft 4.Length over all 5.Breadth over all 6.Draught 7.Source of data (= Community Certificate) 8.Deadweight for cargo vessels 9.Displacement for vessels other than cargo vessels 10.Operator 11.Issuing Authority 12.Number of Community Inland Navigation Certificate 13.Expiration date 14.Creator of dataset
13
13 Data to be processed (2/2) B. Where available (according to 2008/87/EC and RheinSchuO) 1.National number 2.Type of craft in accordance with the Technical Specification for Electronic Ship Reporting in inland navigation 3.Single or double hull in accordance with ADN/ADNR 4.Height as defined in Article 1.01 No 75 5.Gross tonnage (for maritime vessels) 6.IMO number (for maritime vessels) 7.Call sign (for maritime vessels) 8.MMSI number 9.ATIS code 10.Type, number, issuing authority and expiration date of other certificates’
14
14 Schematic overview (Reserved for future purposes)
15
15 Two ENIs for one craft? Information to JWG (10) 5 from 25.1.2010 Meanwhile solved thanks to effective cooperation of authorities
16
16 Implementation and operation of the European Hull Database: Phase 1: Requirements Specification Phase 2: Implementation of a functional prototype Phase 3: Implementation of complete pilot system and execution of the Factory Acceptance Tests Phase 4: Functional Tests Phase 5: Interconnection of the European Hull Database pilot system with vessel certification authorities and RIS Providers Phase 6: Execution of the stability tests of the pilot system (finalized in April 2010) Phase 7: Pilot operation of the system (starting as of 2nd quarter of 2010 for 2 years), in which the contractor hosts the database, provides 1st and 2nd level (telephone) support during office hours and software maintenance Phase 8: Full-scale implementation of the system (after PLATINA) System Implementation (1/2)
17
17 System Implementation (2/2) Technical implementation finalized in April 2010
18
18 Step 1: Exchange of letters for data exchange of authorities issuing ENIs 1.Austria 2.Belgium 3.Bulgaria 4.Czech Republic 5.Germany 6.France 7.the Netherlands 8.Romania 9.Slovakia Step 2: Conclusion of a service agreement for full scale data exchange (including use for RIS services) Ensuring Data Protection
19
19 System Implementation – Outline GUI Layout (4/4)
20
20 System Implementation – Outline GUI Layout (4/4)
21
21 System Implementation – Outline GUI Layout (4/4)
22
22 System Implementation – Outline GUI Layout (4/4)
23
23 System Implementation – Outline GUI Layout (4/4)
24
24 System Implementation – Outline GUI Layout (4/4)
25
25 1.Sequential data upload 1.upload of ENIs issued after 30.4.2007 2.Upload of additional data and certificates 2.Integration of additional countries, functional amendments of the EHDB 3.Conclusion of service agreement for hull data exchange 4.Definition of operator of the EHDB for the time after PLATINA Next Steps
26
26 Participation in the pilot phase is an opportunity to collect experiences without operational risks and disturbances Participation in the pilot phase allows for active involvement in the system development Participation in the pilot phase allows for gradual and smooth implementation in the respective countries Why authorities support the European Hull Database
27
27 Agenda Overview of PLATINA Overview of European Hull Database Reflection group on inland navigation
28
28 NAIADES II ? – Reflection group on inland navigation
29
29 NAIADES II ? – Reflection group on inland navigation
30
30 Thank you for your attention ! Andreas Bäck via donau – Österreichische Wasserstraßen-Gesellschaft mbH PLATINA Project Office Brussels phone +43-664-80842-1609 andreas.baeck@via-donau.org, www.via-donau.org
31
platform for the implementation of NAIADES www.naiades.info
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.