E20 TALLINN - NARVA RECONSTRUCTION MAARDU - VALGEJÕE
2
MAIN OBJECTIVE Reconstruction of various road sections to improve the road condition, traffic safety and road environment
4
MAIN PARAMETERS pavement - 11,5 m (1 + 2 x 3,75 + 3) embankment - 10 - 12,25 m road - 35,5 - 37,5 m central reserve ~ 11 m
5
TRAFFIC VOLUME 20032020 Jägala km 26,4 7270 9880 Kuusalu km 40,3 60408640 Liiapeksi km 52,0 45506500
6
TRAFFIC SAFETY 2000 - 2003 - 42 traffic accidents 5 people killed 59 injured walking along the road - 13 collision with animals - 7 dark time - 54% of the accidents
7
PAVEMENT CONDITION LAST CONSTRUCTED Section 1- 1982 - 1988 Section 2-1962 - 1988 Section 3-1989 - 1990 Section 4-1979 Section 5-1980
8
PAVEMENT CONDITION IRI ruts defects bearing capacity Section 14,76 13,4 1 - 5% 345 Section 25,99 14,4 2 - 8% 390 Section 34,13 13,5 1 - 8% 335 Section 45,85 10,5 2 - 5% 315 Section 56,51 13,5 3 - 7% 299 Critical value 3,5 -8 % 230
10
SCOPE OF MAIN WORKS Construction of the new payment courses Improvement of embankments Improvement of the drainage system Construction of a new bridge Renovation of viaducts and bridges Traffic arrangement and safety measures Environmental mitigation measures
11
MAIN INDICATORS Reconstruction of main road 62,7 km Earthworks 305 000 m 3 Pavement of main road 820 000 m 2 Pavement of road junctions 98 000 m 2 Renovation of viaducts 7 pcs Construction of a bridge 1 pcs Renovation of bridges 5 pcs Renovation of pedestrian tunnels 2 pcs Renovation of cattle creep 1 pcs Safety barriers 30 000 m Wildlife fence 5 500 m Road lighting 3 500 m Culverts and drainage pipes 4 600 m
12
PAVEMENT CONSTRUCTION Main road Milling of existing pavement - 4-5 cm TAB 16 II - 4-5 cm KMA 12 - 4 cm (8,75) / TAB 12 I - 4 cm (2,75) Geogrid Road junctions Milling of existing pavement - 4-5 cm PAB 16 TAB 12 I - 4 cm
13
CROSS-SECTION TYPE II
14
CROSS-SECTION TYPE III
15
CROSS-SECTION TYPE IV
16
EARTHWORKS Widening of embankment (junctions, U-turns) Reconstruction of embankment - km 26,1 - 30,9 - excavation of unsuitable material - excavation of peat - 11 000 m3m3 - demolition of concrete slabs - filling of new material - geotextile
17
DRAINAGE SYSTEM Cleaning of existing ditches Excavation of new ditches Cleaning and repairing of existing drainage system Construction of new drainage system Cleaning of existing culverts Construction of new culverts
18
RENOVATION OF VIADUCTS AND BRIDGES Construction of new waterproofing layer Replacement of expansion joints Repair of all deteriorated concrete on the bridge (footways) and other exposed surfaces Replacement of guardrails Repair of handrails Reinforcement of slopes New asphalt concrete layer on bridge deck
19
JÄGALA VIADUCT
20
JÄGALA II BRIDGE
22
JÄGALA II Length - 18 + 2 x 15 m; L = 53,6 m Width - 15,6 m Type - 3-span continuous steel concrete composite bridge
23
TRAFFIC SAFETY Improvement of road junctions Elimination of entrances, U-turns, technologic turns Improvement of visibility Renovation of pedestrian tunnels - 2 pcs Sidewalks - 2,7 km Guard-rails - 30 km Road lightning - 3,5 km Road marking - rumble strips
24
ENVIRONMENTAL MITIGATION MEASURES Wildlife passages Wildlife fence Wildlife bank tracks Noise barriers Warning signs Hedge Top soiling and grass seeding Roadside clearing and crubbing
25
Wildlife passage
27
Wildlife bank track under the Valgejõe bridge
28
“Image of elk” on pavement (6m x 1,5m)
29
Dwellings at the roadside where a noise barrier will be constructed
30
BUDGET Main works22 000 Supervision 1 100 000 Contingencies 2 200 000 Total 25 300 000