Download presentation
Presentation is loading. Please wait.
Published byMeghan Payne Modified over 9 years ago
1
Town of Westerly Pavement Improvement Plan 2009
2
Determine current pavement condition. Identify and prioritize needed repairs. Coordinate with RIDOT projects. Assess available funding. Select repairs to fit budget framework. Prepare bid documents and advertise.
3
Current Pavement Condition
4
Pavement Management Program Initial inventory and condition survey prepared by Beta Group in 2007. All roads are rated 0-100 with 100 best. Database maintained and kept up to date by Engineering Department. Software automatically predicts pavement condition based on model of deterioration over time.
5
RSR (Road Surface Rating) Network RSR = 69
6
Network Backlog (2009) Repair Method Length (mi) Estimated Cost % Reclamation3.92$1,372,8302.77 Mill & Overlay 9.52$2,415,7816.72 Level & Overlay 55.24$6,321,26139.00 Crack Seal 41.29$227,19129.15 Defer31.67$022.36 Total141.65$10,337,062100.00
7
Network Backlog By Repair
8
RIDOT Planned Projects
9
RIDOT Projects
10
Route 91 1R, Contract 1 - High Street (Route 3) to Larry Hirsch Lane Route 91 1R, Contract 2 – Larry Hirsch Lane to Church St. (Route 216) Shore Rd. Resurfacing – Ocean View Hwy. to Post Rd. Weekapaug Bridge Elm St. & Beach St. (Main St. to Clark St.) Railroad Ave., Dixon St., & West St.
11
Available Town Funds General Fund FY2009 - $450,000 Water Fund FY2009 - $750,000 (Transmission Main Project) General Fund FY2010- $200,000 Total $1,400,000
12
Proposed Town Projects
13
Town Projects Total = 7.75 Miles
14
Westerly 2009 Projects General Fund ($650,000 budget) Crack Sealing – $50,000 (Various Roads) Level & Overlay - $110,000 (Pound Rd., Hiscox Rd. & Wampanoag Ave.) Mill & Overlay - $370,000 (Bellevue Ave., John St., Narragansett Ave., Raymond St., & Ward Ave.) Total - $530,000 est.
15
Westerly 2009 Projects Water Fund ($750,000 budget) Mill & Overlay - $460,000 est. ( Terrapat Dr., Perkins Ave., Pond St., Pierce St., Industrial Dr., Narragansett Ave., & Summer St.)
16
2009 Road Improvements Predicted RSR = 71
17
RI – LEAP Funds (Local Equity Aid Program) $358,000 (Federal) + $150,000 (State) = $508,000 Total Cross St. Pavement & Sidewalks = $525,000 est. $525,000 est.
18
Additional Planned Projects Old Hopkinton Road Canal St./White Rock Road Rehabilitation Bay Street Drainage/Pavement Restoration Bradford Streetscape Project Misquamicut Drainage Extension Chip Sealing Program
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.