Presentation is loading. Please wait.

Presentation is loading. Please wait.

Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.

Similar presentations


Presentation on theme: "Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working."— Presentation transcript:

1 Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working with New Jersey Turnpike Authority Highway and Building Projects November 19, 2009

2 HIGHWAYS / BUILDINGS - DESIGN CONSTRUCTION AWARDS YEAR CONTRACT AWARDS 2008 $ 122 Million (Actual) 2009 $ 235 Million (Actual) 2010 $ 338 Million (Projected) 2011 $ 649 Million (Projected)

3 2009 – Contracts Awarded Highways / Buildings – Design Section NUMBER CONTRACTS 5 4 3 2 3 1 CONTRACT DESCRIPTION PAVEMENT RESTORATION FACILITY IMPROVEMENTS SIGN SYSTEM IMPROVEMENTS ROADWAY IMPROVEMENTS ROADWAY RECONSTRUCTION INTERCHANGE IMPROVEMENTS CONSTRUCTION AWARDED $ 35M $ 15M $ 32M $ 22M $ 128M $ 3M TOTALS = $ 235M

4 2010 –Contracts to be Awarded Highways / Buildings – Design Section AWARD SCHEDULE 1 ST QTR 1 ST & 4 TH QTR 1 ST & 3 RD QTR 3 RD & 4 TH QTR 4 TH QTR 3 RD & 4 TH QTR NUMBER CONTRACTS 3 6 4 2 3 2 6 CONTRACT DESCRIPTION PAVEMENT RESTORATION FACILITY IMPROVEMENTS SIGN SYSTEM IMPROVEMENTS ROADWAY IMPROVEMENTS ENVIRONMENTAL MITIGATION UTILITY RELOCATION ROADWAY RECONSTRUCTION INTERCHANGE IMPROVEMENTS CONSTRUCTION ESTIMATE $ 20M $ 29M $ 49M $ 23M $ 7M $ 30M $ 120M $ 60M TOTALS = $ 338M

5 2011 –Contracts to be Awarded Highways / Buildings – Design Section AWARD SCHEDULE 1 ST QTR 2 nd & 3 rd QTR 1 ST & 2 nd QTR 2 nd & 3 rd QTR NUMBER CONTRACTS 3 7 6 8 6 5 CONTRACT DESCRIPTION PAVEMENT RESTORATION FACILITY IMPROVEMENTS SIGN SYSTEM IMPROVEMENTS ROADWAY IMPROVEMENTS ROADWAY RECONSTRUCTION INTERCHANGE IMPROVEMENTS CONSTRUCTION ESTIMATE $ 20M $ 62M $ 81M $ 21M $ 315M $ 150M TOTALS = $ 649M

6 Pavement Restoration $25M in Annual Resurfacing Contracts (3 – 5 Contracts Ranging from $5M - $8M) Turnpike Resurfacing Milepost 0 to 74 (South) Milepost 74 to 122 (North) GSP Pavement Restoration MP 0 to MP 75 (Southern) MP 75 to MP 146 (Central) MP 127 to MP 172 (Northern)

7 Facility Improvements Contracts to be Awarded in 2010 / 2011 P500.155 – NJSP Vehicle Maintenance Facility P500.158B – PNC Bank Arts Center Amphitheater Improve. A500.TBD – Authority Maint. Bldg. Improve. (5 Contracts) T500.TBD – Turnpike Toll Bldg. Improve. (2 - 4 Contracts) P500.TBD – Parkway Toll Area Improve. (3 Contracts)

8 Sign System Improvements Contracts to be Awarded in 2010 / 2011 T600.156 – Turnpike Sign Panel Replacement – 0 to 48.7 A600.102A – Install VMS on Turnpike and Parkway A600.157 – Advance Sign Structure Fab. (2 Contracts) A600.102(BC&D) – Install VMS/VSLS on TPK (3 Contracts) A600.102(E&F) – Install VMS on GSP (2 Contracts) A600.TBD – Guide Sign Improve on TPK & GSP (North) T600.TBD – Guide Sign Improve on TPK (South) P600.TBD – Guide Sign Improve on GSP (South)

9 Roadway Improvements Contracts to be Awarded in 2010 / 2011 P200.127 – Parkway Guide Rail Improvements – 0 to 126 P200.159 – Advance Clearing for GSP Widening – 48 to 63 P200.140 – GSP – Grading & Drainage Improve – 30 - 48 P200.TBD – Install Raised Pavement Markers on GSP P200.171 – GSP Drainage Improvements – 0 to 140 T200.TBD – Turnpike Median Barrier Repairs – 0 to 122 T200.TBD – TPK Local Pier & Abutment Protection Impr. P200.TBD – GSP Local Pier & Abutment Protection Impr.

10 Environmental Mitigation Contracts to be Awarded in 2010 / 2011 P900.121 – Great Bay Boulevard Bulkhead Improvements T700.TBD – Piles Creek Wetland Mitigation

11 Utility Relocation Contracts to be Awarded in 2010 / 2011 P900.TBD – Relocation of Overhead Utilities – MP 63 to 80 P900.TBD – Force Main Relocation – MP 10 to 12 P900.TBD – Advance Utility Relocation – MP 48 to 63

12 Roadway Reconstruction Contracts to be Awarded in 2010 / 2011 P100.132 – Widen & Rehab Patcong Creek Bridge – MP 31 P200.TBD – Grade Separation Improve at Int. 9, 10 & 11 P200.136 – Widening of the GSP – MP 58 to 63 P200.135 – Widening of the GSP – MP 52.5 to 58 P200.134 – Widening of the GSP – MP 48 to 52.5 P200.TBD – GSP Shoulder Reconstruction – MP 93.5 - 99.5 P200.TBD – GSP Shoulder Reconstruction – MP 88.5 - 93.5 P200.TBD – GSP Shoulder Reconstruction – MP 83.5 - 88.5

13 Interchange Improvements Contracts to be Awarded in 2010 / 2011 P300.172 – Improvements to GSP Interchanges 141 & 150 T300.188 – Turnpike Interchange 10 Improvements P300.TBD – Operational & Access Improvements to Int. 145 T300.176 – Turnpike Interchange 9 Improvements P300.TBD – Improvements to GSP Int. 153 & 154/155P T300.TBD – Turnpike Int. 15W & Int. 16W Improvements P300.TBD – Improvements at GSP Interchange 157 T100.023 – Tremley Point Connector Road P300.TBD – GSP Interchange 88 Improvements T300.TBD – Turnpike Interchange 8A Improvements P300.TBD – GSP Interchange 91 Improvements


Download ppt "Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working."

Similar presentations


Ads by Google