Herriman City Engineering Department
2
Herriman City has experienced tremendous growth over the last several years Many new subdivisions and associated roads have been constructed in the City
3
The rapid growth and construction activity has exposed our roads to traffic and heavy loads, which in some cases accelerated the deterioration of our roads
4
Currently Herriman City has as an inventory of 17,821,898 SF of asphalt road. A well implemented preventive Road Maintenance plan is needed to take care of our roads and keep them operative and functional.
5
Preventive Maintenance not reactive maintenance Deterioration = Life Very Cost Effective Applicable for all pavements Right treatment, right pavement, right time Importance of life-cycle cost analysis
9
“Every $1 spent in keeping a good road good precludes spending $6-$14 to rebuild one that has deteriorated.” Now Later
10
Crack seal Patching Fog seal Chip seal Slurry surfacing Overlay Full Depth reclamation
11
Primary Road Maintenance Treatments: Crack seal/ Patching/Slurry seal Mill and Overlay Full depth reclamation (FDR) Dirt Road pavement
12
Road Maintenance Plan
13
Recommended 6 Year Slurry Seal Maintenance Plan
15
Recommended 6 Year Overlay Maintenance Plan
17
Recommended 6 Year Full Depth Reclamation
19
Recommended 6 Year Dirt Road Paving Plan
21
Road Maintenance Plan
22
Areas in red are to be sawcut and repaired
23
Note size of cracks Cracks sealed 2009 New cracks formed 2010
24
Cracks sealed 2009 New cracks formed 2010
25
Cracks sealed 2009 New cracks formed 2010
26
Cost of repairs this year in Copper Creek Cost of repairs in 2007: $25,000 Cost of repairs in same area 2010:$230,000 New roads need a timely schedule of regular maintenance 5-7 years after Initial Construction
28
Cracks sealed 2009New cracks formed 2010
29
Cracks sealed last year New cracks formed this year
30
Claim Staker Way and Midas Gold Road Cost of repairs in 2007: $15,000 Cost of repairs in same area 2010:$175,300 New roads need a timely schedule of regular maintenance 5-7 years after initial Construction
32
5 yrs 10 yrs 15 yrs 20 yrs 15 yrs 20 yrs 10 yrs
33
Annual Budget Requirements for Current Roadways (18.3 Million Square feet): Pavement Management Option ▪ $853,000 No Pavement Management Option ▪ $9.4 Million