Download presentation
Presentation is loading. Please wait.
Published byLynette Blake Modified over 9 years ago
1
SUSTAINABLE PAVEMENT ROUND TABLE February 10, 2015 RIVERSIDE COUNTY TRANSPORTATON DEPARTMENT
2
TOTAL MILES (COUNTYWIDE) FUNCTIONAL CLASSIFICATION CENTERLINE MILES LANE MILES PCI Arterial44494869 Collector5541,10770 Residential/Local9131,81571 Gravel/Dirt253506- TOTAL2,1644,376 Overall PCI70
3
ROAD CONDITION BY DISTRICT DISTRICT 2 DISTRICT 5 DISTRICT 1 DISTRICT 3 DISTRICT 4
4
PCI BY DISTRICT Overall PCI (70)
5
FUNDING HISTORY & PCI
6
ROAD MILES TREATED & PCI
7
PAVEMENT MANAGEMENT Program – StreetSaver by MTC Uses PCI ASTM D6433 compliant NEWLY PAVED FAILED ROAD
8
DETERIORATION CURVE
9
PAVEMENT INSPECTION Inspection every year on ¼ of road network Visual inspection by two-man crew Data collection using tablet device GIS integration
10
DATA COLLECTION Network Level GPR – layer thickness FWD – structural condition Project Level Coring Rig
11
PAVEMENT PRESERVATION Definition - a program employing a network level, long- term strategy by using an integrated, cost-effective set of practices that extend pavement life (FHWA). County’s Objective - Preserving roads already in good condition. spending taxpayer’s money cost effectively developing treatments based on pavement condition by using BMPs
12
BEST MANAGEMENT PRACTICES Achieving a target PCI Seal Coat Treatment Chip Seal Slurry Seal Cape Seal Scrub Seal
13
SEAL COAT Chip Seal 110 – 125 miles per year RAP Chip Slurry/Cape/Scrub Seal 60 miles per year Type 2 RAP Chip
14
OVERLAYS Hot mix asphalt 15% RAP up to 2 inches thick Rubberized hot mix asphalt crumb rubber from scrap tires per Greenbook up to 2 inches thick
15
RESURFACE/RECONSTRUCT Mill & Fill Full Reconstruction Soil Stabilization (CTB, Lime) Recycling CIR o 3-4 inches of total thickness o Corona area (Nov 2012) FDR o Full depth o Foamed asphalt o Redlands Blvd (Sep 2008)
16
SEAL COAT PHOTOS
17
CIR PHOTOS
18
RESURFACING
19
LESSONS LEARNED Slurry Seal Measurement & Payment – by TON Full-time inspection Testing – WTAT, portable truck scale, dipstick Chip/Cape/Scrub Seal Separate line item for emulsion and aggregate Payment for emulsion by TON Payment for aggregate by SQYD
20
LESSONS LEARNED CIR/FDR Construction timing – Summer/Fall Longer cure time in cool weather Swell factor (10%) Tend to ravel if left uncovered for more than 3 days Apply fog seal to control raveling Cost effective for long straightaway roads with minimum road curves and valves
21
QUESTIONS?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.