Download presentation
Presentation is loading. Please wait.
Published byElvin Fleming Modified over 9 years ago
1
DIVISION OF TRANSPORTATION IRTBA General Membership Meeting October 27, 2011
2
Proposed FY2012 Program Proposed Five-Year Highway Improvement Program Recovery Zone Bonds
3
Cash Reserves Revenue O & M Costs Capital Expenditures
4
Local Gas Tax $.04 per gallon Motor Fuel Tax portion of state tax per gallon Impact Fees Grants and Reimbursements RTA Tax State Capital Bill RZ Bonds
6
CMAQ$1,377,000STP$6,829,435 HPP$320,000 Safety$989,100 HBP$2,612,000 Total Total$12,127,535
10
Engineering Feasibility studies Planning/environmental reports Design/contract documents Construction oversight Land Acquisition Construction Projects Participation Agreements
11
55 th, Williams to Holmes Construction 55 th Street, Dunham-Clarendon Hills Road Planning 75 th over EBDR Construction 75 th, I-355 to Lyman Construction 75 th, Adams to Plainfield Design/LA Belmont @ Curtiss Construction Fabyan Parkway at IL 38 Design Gary, North to Army Trail Design/LA Roselle @ Walnut Construction 2012 Pavement Maintenance Construction Several Bike Trails Planning/ Design
12
Pavement Maintenance Contract(s) $2.9M Traffic Signal/Lighting Maintenance $1.0M Pavement Marking $400K Landscape Maintenance $250K Guardrail and Fence $200K Wetland Maintenance $150K Mowing$265K
13
63 rd @ IL 83 $650K Belmont @ Curtiss $2.2M Glen Ellyn Road under CCPRR $1.5M Midwest Road @ Lower Mayslake $250K Sidewalk Repair/Installation $300K
14
55 th Street, Williams to Holmes $4.41M 75 th Street, I-355 to Lyman $13.1M 75 th Street over East Branch DuPage River $2.5M Geneva/Glen Ellyn Road $975K Countdown Pedestrian Signals $300K Thorndale Avenue at I-290 $4.7M 75 th Street at Washington (Naperville) $1.86M Munger Road Extension (Cook County) $700K Stearns Road (Kane County) $995K
17
Repair campus infrastructure Update technology infrastructure Stormwater improvements Transportation improvements
18
Total Authorization$ 69.9M Campus Infrastructure$ 26.7M IT$ 7.1M Stormwater$ 17.2M Transportation$ 15.3M
19
55 th Street Cass to Holmes $1.2M 75 th Street Woodward to Lyman $5.0M Belmont @ Curtiss Street $3.0M Gary Avenue North Avenue to Army Trail Road $5.4M 31 st Street Highland to Meyers (Bike Trail) $300K Warrenville Road Naperville to East Branch DuPage River (Bike Trail) $400K
20
Brewster Creek Watershed$ 5.0M Church Hill Woods Dam Modification$ 1.7M Klein Creek/West Branch Flood Modification$ 5.0M Warrenville/Winfield Flood Mitigation$ 5.2M Convalescent Center Kitchen$ 6.0M Campus Standby Generators$11.7M
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.