July 23, 2013 Street by Street Committee
2
2 Projects SW 48 th Ave & Garden Home 3900 block of NE 59 th Ave
3
SW 48 th Ave & Garden Home
4
4709 N Oberlin 240 estimated vehicle trips per day 40 ft width ROW
5
4709 N Oberlin Tax lots
6
4709 N Oberlin Street pavement surfaces
7
4709 N Oberlin Maintenance responsibility
8
4709 N Oberlin Future Neighborhood Greenway
9
4709 N Oberlin N Oberlin, Huron to Newman, is a 354 ft long dirt and gravel road in a 40 ft ROW Huron and Newman are improved with pavement, curb and most sidewalks Oberlin is a future neighborhood greenway in the 2030 plan GIS shows some narrow pavement on Oberlin west of Huron, however, street view does not show pavement Oberlin ends at the peninsula crossing trail to the west and does not continue east of Newman, so cut-through traffic is unlikely
10
4709 N Oberlin Oberlin, Olin to Newman, has 16 homes and the potential for eight more A connection from Huron to Newman is unlikely to attract much traffic, though completion of Oberlin west of Huron could do so in the future Up to 240 trips per day are anticipated from 24 homes Oberlin ends at the peninsula crossing trail to the west and does not continue east of Newman so cut-through traffic is unlikely Speeding is not anticipated unless Oberlin is completed west of Huron
11
4709 N Oberlin Oberlin, looking east from Olin
12
4709 N Oberlin Oberlin, looking east at Huron
13
4709 N Oberlin Oberlin, looking east to Newman
14
4709 N Oberlin Oberlin, looking east at Newman
15
4709 N Oberlin Oberlin, looking west from Newman
16
4709 N Oberlin Oberlin, looking west
17
4709 N Oberlin Oberlin, looking west to Huron