Operations Management Overview at CNH Saskatoon 10/15/13
2
Plant Information
3
The previous company, Flexi-Coil Ltd., was established in 1952. During the 1990s Flexi-Coil became Canada's largest farm manufacturer. Air Seeding and Tillage industry leader in North America and Australia. (air carts, drills and coil packer) New Holland purchased 35% of Flexi-Coil in 1997 1999 Merger of New Holland and CaseIH The remaining shares of Flexi-Coil were acquired in January of 2000 Flexi-Coil Company History
4
PLANT 632,000 SQUARE FT 58,700 SQUARE M LAND 156 ACRES 63 HECTARE Saskatoon Facility
5
Manufacturing 94 Salaried 723 Hourly Total Saskatoon Site817 Fabrication:113 West Plant:218 East Plant:236 Other:156 No third party logistics Headcount
6
CNH SASKATOON INFORMATION CNH Saskatoon Sales 2012 - $412M CNH Projected Sales 2013 - $500M
8
8 Plant Summary – Supplier Distribution Saskatoon Suppliers 0-20 Km 18% 2160 p/n 0-20 Km 18% 2160 p/n Step 3 Activity with Local Suppliers
9
Plant Layout East Powder Paint Line Planter, Header Assembly Lines Planter and Header Weld Stalls Fabrication Equipment Receiving / Warehouse West Powder Paint Line Air Seeder line Tillage and Air Seeder Weld Stalls Tillage Crating and Component Assembly M66 Assembly
10
Fabrication is divided into two areas North Fabrication Torch and Machine Types of Equipment: 8 Vertical Milling Machines 9 CNC Lathes 3 Lasers 6 Plasma Cutters 7 Punch Presses (110ton to 800ton) 7 Press Brakes 12 Saws (autosaws, CNC, and Large Saws) Fabrication Department
11
Volumes
12
Product Line
13
Air Carts (4 models, 3 brands) Air Carts (4 models, 3 brands) Hoe/Disk Drills (4 models, 3 brands) Hoe/Disk Drills (4 models, 3 brands) Planters (17 models, 1 brand) Planters (17 models, 1 brand) Products
14
Corn Heads (2 models, 2 brands) Corn Heads (2 models, 2 brands) Pickup Heads (2 models, 2 brands) Pickup Heads (2 models, 2 brands) Products
15
2011- 2013 New Product Launches Pickup Header January 2011 16R30/18R20 Corn Header April 2011 580 Bu Air Cart February 2011 1265 Planter January 2013 M66 January 2013 January 2013 Pull-Type Sprayer Dec 2011
16
16 USA 70.6% Canada 21.9% China 2.6% S America 0.6% Australia/NZ 2.0% Africa 0.5% CIS 1.8% Plant Summary – Customer Distribution
17
17 Plant Summary – Operational Complexity MFG Parts: 34,833 Buy Parts: 9,883 Lines – 7 Models – 50 TT – Technical type - 348 Options - 1289 6 33 346 Planters 16 366 Air Systems Headers 8 34 60 Disc Drills 4 42 60 Air Drills 8 36 160 Sprayers 3 63 177 Drawbars 2 84 12 Cultivators 3 40 108
18
Operational Complexity - Scheduling 18
19
PLANT METRICS
20
KPI - Lost Time Injury Frequency KPI – First Aid Injury Frequency 20 Plant KPI’s - Safety 100% Decrease in LTI Frequency since 2008 74% Decrease in First Aid Frequency since 2008 3 Million Hours no Lost Time Injury
21
World Class Manufacturing WCM audit May, 2013 – 54 points, Number 1 CNH plant in NA 1 st out of 30 CNH plants world wide
22
Considerable improvements to Plant KPI’s ( Safety, Quality, Productivity, Shipping ) Continue to empower employees (ESP, Employee Observation Form, Quick Kaizen, Plant Wide Data Collection) Staying competitive globally requires constant growth and improvement 2011 Savings $5.6M 9.0% of Trans. Cost 2012 Savings $5.9M 9.2% of Trans. Cost Why WCM Is Important to Saskatoon
23
Employee Suggestion Program Motivation of Operators Motivation of Operators 61% Implemented 2,535 Suggestions YTD
24
201120122013 Annual Savings$5.6 M$5.9 M$4.6 M % Trans. Cost9.0%9.2%9.1% WCM As A Way of Life In Saskatoon
25
Route Map to WCM 2013 Route Map to WCM
27
18 major projects initiated in WO/Log/AM/PM/QC/FI 16 Fiat Experts from Mirafiori Plant arrived for 8 weeks Isvor Trainers were onsite for 4 weeks Saskatoon project champions consisted of Supervisors/Manufacturing Engineers/Group Leads 2008 2009 2010 2011 2012 27 WCM Evolution WCM Starts Mar. 2008 Yamashina Audit Oct. 2010 37 Points Mr. Pino Audit Dec. 2011 44 Points Yamashina Audit April 2009 14 Points Materazzo Audit Aug. 2010 35 Points Mr. Emo Audit May 2011 41 Points Mr. Risi Audit Nov 2012 50 Points Mr. Orkun Audit May 2013 54 Points Fiat Special Action Plan Feb. 2009
28
Communicated weekly Tied to employee PLM Clarity of Objectives 28 Clarity of Objectives – KPI’s
29
Objectives managed through central Performance Management System (EHRMS System) Plant Functional Area Salaried Employee Goal Alignment Hourly Employee Performance/Results Plant Manager’s Goals provide the foundation for all other objectives. For 2012 they are: -Cost (Productivity & Spending) -Safety -Quality -Delivery & Inventory -WCM Area Manager’s Goals are derived from the Plant Manager’s goals. For 2012 they are: -Cost (Productivity & Spending) -Safety -Quality -HR -WCM Production Supervisor’s Goals are derived from the Area Manager’s Goals and linked with their employee’s Goals: -Spending -Productivity -Safety -Quality -HR -WCM Hourly Employee’s Goals are derived from the Success Share Targets set across all plants: -Spending -Productivity -Safety -Quality -WCM Example of Goal Alignment from Plant Manager to the Hourly Employees: 29 Clarity of Objectives – KPI’s Clarity of Objectives
30
Kaizen Tracking Board Activity BoardsPillar Display Boards Departmental BoardsFront Entrance Safety KPI Display Boards 30 Clarity of Objectives – KPI’s/Communication Clarity of Objectives
31
Some Of The Methods- Tools Used So Far: DOE PPA Regression Analysis LCA Kaizen (QK, SK, MK, AK) NVAA Analysis SOP / OPL’s Spaghetti Diagram Process Mapping EWO Herca’s PFMEA Poka Yoke Video Analysis (WO/LOG/FI) SMED TWTTP/HERCA 31 Commitment of the Organization WCM Tools Used
32
Headcount
33
KPI - Lost Time Injury Frequency KPI – First Aid Injury Frequency 33 Plant KPI’s - Safety 100% Decrease in LTI Frequency since 2008 74% Decrease in First Aid Frequency since 2008 3 Million Hours no Lost Time Injury