The future of automated construction excellence. Industry Trend More for Less Metal Construction Components Competitive Advantage Business Concept Process.

Similar presentations


Presentation on theme: "The future of automated construction excellence. Industry Trend More for Less Metal Construction Components Competitive Advantage Business Concept Process."— Presentation transcript:

1 The future of automated construction excellence

2 Industry Trend More for Less Metal Construction Components Competitive Advantage Business Concept Process Organization Benefits More for Less

3 Industry Trend Faster, Faster, Faster ► Lean Thinking ► Lean Construction Institute ► Reduce Labor to Control Costs ► Trend Will Be Toward Panelization

4 Conventional Fabrication Pace Maximum of 100 Feet of Panel Per Day (Two Workers) Average of 50-60 Feet of Panel Per Day (Two Workers)

5 How do you get the edge on your competition?

6 MC 2 Fabrication Pace Conventional Fabrication Pace Maximum of 100 Feet of Panel Per Day (Two Workers) Average of 50-60 Feet of Panel Per Day (Two Workers) Maximum of 500 Feet of Panel Per Day (Two Workers) Average of 350 Feet of Panel Per Day (Two Workers)

7 Used in production since 2001

8

9

10 Metal Construction Components automated process allows wall panels to be pre-assembled in a controlled environment. Panels are constructed using automated welding processes that reduce construction time while also increasing the structural load capacity with high strength silicon bronze welds. OSB, dens glas, or other non-finish sheathing can be installed to further reduce the time required for erection. Panels are labeled and placed on pallets in construction order to be delivered to the jobsite as needed.

11

12

13

14

15 Management Shop Foreman Shop Staff (3-4/shift) Shop Staff (3-4/shift) Office Assistant Design Estimator(s) Plant Manager

16 Dramatically Reduces Labor Costs Increases Productivity BENEFITS Decreases Floor Space Reduces the Need for Skilled Carpenters Locates Each Stud Precisely Produces a Square Panel Every Time Minimizes the Opportunity for Error Increases Production Capacity Per Square Foot of Factory Floor Increases Productivity Decreases Floor Space Reduces the Need for Skilled Carpenters Locates Each Stud Precisely Produces a Square Panel Every Time Minimizes the Opportunity for Error Increases Production Capacity Per Square Foot of Factory Floor Dramatically Reduces Labor Costs

17 See us at www.mcsquared.cc The future of automated construction excellence