1
May 14, 2014 RAMSHORN POND DAM REHABILITATION PUBLIC INFORMATION SESSION PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer
2
Additional Evaluations Proposed Design Approach Additional Design Considerations OUTLINE
3
Upstream Membrane Option ADDITIONAL EVALUATIONS
4
Upstream Membrane Option ADDITIONAL EVALUATIONS
5
Toe Drain Impacts Reviewed improvements provided by downstream toe drain Existing Seepage Exit Gradient Factor of Safety = 1.2 With Toe Drain Exit Gradient Factor of Safety = 2.0 Dam safety practice designs for a Factor of Safety = 5.0 ADDITIONAL EVALUATIONS
6
Opinions of Cost Significant cost impacts associated with contingencies and early stage of design ADDITIONAL EVALUATIONS
7
Recommended Approach Upstream Cutoff Wall Durability Permittability Schedule Drawdowns ADDITIONAL EVALUATIONS
8
Proposed Site Plan DESIGN APPROACH
9
Proposed Spillway DESIGN APPROACH
10
Proposed Low Level Outlet DESIGN APPROACH
11
Proposed Upstream Wall DESIGN APPROACH
12
Proposed Parking DESIGN APPROACH
13
Proposed Public Access DESIGN APPROACH
14
Proposed Drainage DESIGN APPROACH
15
Control of Water Drawdowns Bypass / Flow Maintenance Cofferdams Construction Phasing Detours / Road Closure Public Access Information / Signage ADDITIONAL DESIGN CONSIDERATIONS
16
QUESTIONS