Download presentation
Presentation is loading. Please wait.
Published byClare Justina Wiggins Modified over 9 years ago
1
John Wotton Thornhill Resident
2
Lake Mabel Drive Mabel Bridge Thornhill
3
Long time residents with beautiful lakefront homes. Former KB management and home owners have history of mistrust in regards to green space on property line. Two confirmed items that are true: One of their own is selling the property to KB. No line of sight to the construction site.
7
Pond residents paid premium for lots that included a pond and green space. No change to the pond! Compromise on green space by not building on first three original proposed lots 36% of new construction is adjacent to Mabel Bridge residents! Four homes adjacent construction- one home owner not moved in.
10
64% of proposed construction is adjacent to Thornhill residents. Community concerns: Increased traffic through Thornhill. Safety of children using playground. Resale value? Lot premiums paid for green space. Construction equipment, thefts and damages.
11
Three concerns: -Owner of property has the right to take down every tree in the green space. -Current zoning allows for larger/mansion type homes that could be back to back with Thornhill with no buffer. -Not knowing the future with this property!
12
Written Agreement with Thornhill HOA 40 ft. buffer of current green space. Buffer area to be turned over to Thornhill HOA. Three designated traffic devices for the safety of our children. Construction plan to minimize traffic, increase safety and assist Thornhill owners with after construction improvements.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.