Download presentation
Presentation is loading. Please wait.
Published byCorey Hodges Modified over 9 years ago
1
2008, July 15-17 Nantes 1 APD Tests : Status and Protocol Giuseppe S. Pappalardo INFN Catania
2
2008, July 15-17 Nantes 2 APD testing station in Catania Protocol Test results Conclusions and Perspectives Outline
3
2008, July 15-17 Nantes 3 Testing set-up / 1
4
2008, July 15-17 Nantes 4 Testing set-up / 2
5
2008, July 15-17 Nantes 5 Testing set-up / 3
6
2008, July 15-17 Nantes 6 APD dependence on the bias voltage M(V) = H(V) / H(plateau) Parameterization with an exponential plus a constant: M(V) = p 0 + p 1 exp(p 2 V) 16 APDs under test simultaneously
7
2008, July 15-17 Nantes 7 Definition of the plateau /1 1) H(plateau) = p0+p1 (from fit) -> not stable 2) H(plateau) = H(50)
8
2008, July 15-17 Nantes 8 Definition of the plateau /2 Fit done only in the V30 region
9
2008, July 15-17 Nantes 9 Time schedule for the tests ~10 min to assembly APDs on the plate ~20 min for the temperature stabilization ~40 min for the measurement of the gain curve + analysis About 1 h 10 min to test 15 APDs (1 APD left as a reference) About 6.5 week to test 1300 APDs (from Sept 1 to Oct 15)
10
2008, July 15-17 Nantes 10 APD Gain dependence on temperature /1
11
2008, July 15-17 Nantes 11 APD Gain dependence on temperature/2 APD 1-8
12
2008, July 15-17 Nantes 12 APD Gain dependence on temperature/3 APD 9-16
13
2008, July 15-17 Nantes 13 APD Gain dependence on temperature/4 - Small fluctuations from APD to APD - Realistic measurement of the temperature (thermal equilibrium and thermocouple position)
14
2008, July 15-17 Nantes 14 Temperature coefficient 1/M dM/dT = -1.7 % (@ M = 30) Example: T = 1° C M = 30 0.5
15
15 Since now we have tested about 170 APDs The average value of V30 is 362 Volts with an RMS of 13 Volts 10% of APDs have a V30>380 Volts 3.5% of APDs have a V30>390 Volts V30 statistics:
16
2008, July 15-17 Nantes 16 Conclusions and Perspectives Present Status: A working testing station has been set up Procedure tested In the future: Starting the testing activity for APD mass production in September Realization of the system for gluing APD and light guide
17
17
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.