Download presentation
Presentation is loading. Please wait.
Published byCory Barrett Modified over 9 years ago
1
Long Term Care Facility Resiliency & Evacuation Planning Workgroup Strategy and Actions to Ensure a Safe Environment of Care during extended loss of normal electric power
2
Background A proposed tasking by GA to VDH and DSS- in response to effects of power loss after “Derecho” event last year VDH/DSS moved ahead and convened group to develop recommendations for improvement Work group members include VHCA, VANHA, SFMO, DARS, VALA, VPLC, jurisdiction EM, VDH, DSS and healthcare coalition EM
3
Three Sub-Groups Resiliency and Evacuation Planning – Review current capabilities and identify gaps – Identify information and planning resources to assist facilities strengthen capabilities – Identify and recommend actions for effective information sharing, maintaining situational awareness – Identify/recommend opportunities for enhanced mutual aid and community partnership
4
. Facility Operations/Emergency Power Review/recommend how performance, capacity & reliability of power generators and electrical engineering systems could be improved Identify/recommend actions for expediting repair/replacement/augmentation of installed systems during a power loss event
5
. Outreach to Stakeholders Draft a comprehensive list of stakeholders and recommend how best to engage them in a collaborative effort toward ensuring a safe environment for their residents during a prolonged power outage or other emergency that impact normal facility operations Get input on what resources, training, guidance, etc. they need in order to address issues impacting safety/environment of care for residents
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.