Bridge Projects PCEF Meeting Dover, DE Aug 25, 2009 Troy M. Jenkins, P.E. Chief Engineer Northeast Prestressed Products, LLC.

Similar presentations


Presentation on theme: "Bridge Projects PCEF Meeting Dover, DE Aug 25, 2009 Troy M. Jenkins, P.E. Chief Engineer Northeast Prestressed Products, LLC."— Presentation transcript:

1 Bridge Projects PCEF Meeting Dover, DE Aug 25, 2009 Troy M. Jenkins, P.E. Chief Engineer Northeast Prestressed Products, LLC.

2 PCEF – Bridge Projects by State PA: 20 Bridges 471 Beams DE: 1 Bridge 14 Beams MD: 11 Bridges 106 Beams NJ : 3 Bridges 80 Beams NY: 11 Bridges 165 Beams VA: 5 Bridges*676 Beams MA : 6 Bridges 101 Beams RI : 2 Bridges 35 Beams CT : 1 Bridge 12 Beams *582 beams listed as one bridge project.

3 PA Bridges Alternate Designs: 6 Bridges – 255 Beams Latest Alternate Project: – 4 Contractors Bid Concrete Alternate – 0 Contractors Bid Steel As-Designed – Contract price $101,558,000 – Bridge price $ 56,487,262 Design Build : 3 Bridges – 96 Beams Latest Design Build: Contract PriceBridge Price – PCEF Solution – $16,280,860$7,008,800 – Steel Solution – $17,697,000 $8,204,498 Savings $ 1,416,140$1,195,698 Work In Progress: Splice Girder Standard – Starting with Simple Span designs.

4 NJ – Precast Substructure

5

6

7

8

9

10

11

12 NYSDOT Deck Bulb Tee

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28 VA – Post Tensioned Arch

29

30

31

32

33

34

35

36 Private Bridge in Massachusetts

37

38

39

40

41

42 Other Projects KY – 3 Span Box Beam – 132ft Radius CT – PCEF Beams = NEBT – Full Depth Precast Deck Panels MA – 3 Span Splice Girder (PCEF)