Download presentation
Presentation is loading. Please wait.
Published byRoss Merritt Modified over 9 years ago
1
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy February 2015
2
2
3
Took average of January 2011 through December 2011 as the standard 3
4
4 See ATIS-0100021 Analysis of FCC-Reportable Service Outage Data for a description of the method used to calculate the outage index.
5
5 Procedural events are ones which have a procedural root cause. Many of these events are related to Planned Maintenance. (We will not include this chart next time)
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14 Wireline outages are all outages for which the Reason Reportable was at least 900,000 wireline user-minutes.
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
27
27 Non-DS3-Simplex Outages Data from 1/12 thru 12/14 Conclusion: Non DS3- Simplex Outages are unchanged in duration from 1/12 to 12/14 DS3-Simplex Events Only Data from 1/12 thru 12/14 Conclusion: DS3-Simplex Events are unchanged in duration from 1/12 to 12/14 Rank Correlation of duration with date is.001 and is not significant Rank Correlation of duration with date is.011 and is not significant
28
Changes to NORS/DIRS: Added ability to send text messages when DIRS is activated. Comments and suggestions are greatly appreciated 28
29
Current Teams Best Practices Team Outage Reporting Advisory Team Improvements to the NORS System Improvements to the template Recommended ways to communicate information Improvements to NORS/DIRS manuals Fiber Cut Team (Done) IP Transition Team Planned Maintenance Team: Examine planned maintenance events; recommend ways to upgrade the system without affecting service 29
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.