Todd R.Bergland Trnsport Systems Manager Minnesota DOT Quantities Manager and the Interface to Estimating Full Implementation
2
Ben & Jerry’s offers a progressive benefits package that includes the usual stuff plus paid family leave, health club memberships and three free pints of Vermont’s Finest super premium ice cream, frozen yogurt and sorbets every day!
3
Quantities Manager and the Interface to Estimating Full Implementation Quantities Manager Overview Implementation Overview Implementation Steps 1-9 Reporting General Considerations/Findings
4
Quantities Manager Overview Java based stand-alone application MicroStation or GEOPAK use not required (Non- Graphic portion) MicroStation and GEOPAK license required Access database format
5
Quantities Manager Overview Quantity Manager Design and Computation Manager Quantity Database Trns*port Database
6
Quantities Manager Overview Microsoft Access SQL Server Oracle Others Quantity Manager Quantity Database JDBC ADO DBMS Option
7
Quantities Manager Overview Quantity Manager Payitem/ Funding Master List Payitem Quantities Estimator Trns*port PES Trns*port PES/CES GEOPAK InRoads June 2004 DesignXML Interface Estimation Trns*port CES
8
Quantities Manager Overview
9
Bridging The Gap Design aecXML Method
10
Quantities Manager Overview Promotes Standardization. XML is the future Promotes Collaboration. Connections between disparate applications. Allows for sorting, searching, reporting,importing,exporting and updating. Example ( Engineers Estimates) AecXML Benefits
11
Implementation Overview Trained all nine districts Implemented Standards for exchange Processed 30 projects Require all projects be processed using Quantities Manager Two Phase Implementation
12
Implementation Overview Phase I – Fully implemented Non-graphic pay items Database delivery to Estimating Unit Utilities tabulations Engineers Estimate Introduce new DDB for beginning new projects Phase II – Tentatively set to coincide with V8 More templates for tabulations Graphics pay items Estimated quantities for multiple S.P.s
14
Implementation - Step 1 Payitem List - AECITEM00.XML Pay item numbers Descriptions Units of Measure (including lump sum) Funding List - AECFUND.XML Pay item numbers Descriptions Cost Estimate (Excel) - Average_engineers_estimate_english01.csv Pay Item Several cost estimates Trns port Exports
15
Implementation - Step 1 Export By Spec Yr. 00 01 Export Items
16
Implementation - Step 1 Export Funds
17
Implementation – Step 1 Export Sample Add xml piece
18
Implementation QM Step 2 Sets up pointers to Trnsport files Sets up Spec Year (English / Metric) Seed Database
19
Implementation - Step 2 Seed Database
20
Implementation – Step 3 Filter by unit system, spec year and payitem name Define Items
21
Implementation - Step 3 Multiple Pay Items
22
Implementation - Step 3 Individual Pay Items
23
Implementation - Step 4 Pay items from Trnsport MUST match DDB Item! Graphic Items
24
Implementation - Step 5 1 Phase for each State Project 1 Phase for every funding splits Funding
25
Implementation - Step 5 100% State Funding 90% Federal Funding 10% State Funding 80% Federal Funding 20% State Funding Mixture of State, Federal and City Funds Four Common Funding Splits
26
Implementation - Step 5 SP #1 SP #2 50% City 50% State DesignEstimate DesignEstimateA DesignEstimateB
27
Implementation - Step 6 Export XML File to Trns port
28
Implementation - Step 7 Import XML File to Trns port PES/CES
29
Implementation Step - 8 Review Quantities
30
Implementation - Step 9 Rename Project
31
Reporting Create Custom Reports using Style Sheets
32
Reporting Select a category Select individual or groups of quantities
33
Reporting Export costs from Trns*port Import costs into QM Adjust as needed Create report Can be done throughout project life cycle Final Design Estimate Traffic Signal Estimate
34
Reporting Statement of Estimated Quantities
35
General Considerations DataRestrictions Project Names<= 13 characters Funding Rules> 1 and < 9999 PhasesDesignEstimate Quantity ValueMaximum of 999,999,999.999 Pay Items Must Exist in Trnsport Payers Must Exist in Trnsport Rules for Transfer
36
General Considerations Mn/Dot does not utilize the Payers option in the Quantities Manager as this will be determined by the PES Manager.
37
Examples: Utilities Inplace Drainage Must match DDB Feature in terms of symbology Store in its own QM database General Considerations Non-Pay Item Graphics
38
General Findings Small.5 -.75 hrs. Medium 1-1.5 hrs. Large 2 days Time Savings
39
General Findings Streamlining Improvements Major time savings One database used for multiple purposes Decrease in time (after learning curve) Improved Quality Correct (up to date) pay item numbers Eliminate human error Promotes standardization Design Benefits of QM/Trns port Sharing
40
Sharability of data Estimating, Finance, Construction,Traffic Further XML Enhancements Lat/Long Transfer Begin Station – End Station Begin Termini – End Termini Export Facility from PES/CES Electronic bidding life cycle QM database is one part of the 100% electronic plan Long Term Goals – “ Big Picture” General Findings
41
References www.w3c.com www.bentley.com www3.dot.state.mn.us/qm/qm.html
42
ANY QUESTIONS
Similar presentations