.1 Overview of B&W Medical Isotope Production System Foundation for Nuclear Studies September 27, 2011 Steve Schilthelm Deputy Program Manager
2
.2 The Babcock & Wilcox Company Government Operations Power Generation Systems High-Consequence Operations & Services Advanced Engineering and Manufacturing Manufactures and services coal, biomass, CNG, concentrated solar power plant equipment, & Nox, Sox, mercury scrubbers Manufactures nuclear components for U.S. Department of Energy Manufactures commercial nuclear components and provides services to commercial nuclear market Manages and operates high-consequence facilities, provides technical services and support to government agencies and private customers B&W Nuclear Operations Group, Inc. B&W Power Generation Group, Inc. B&W Power Generation Group, Inc. B&W Nuclear Energy, Inc. B&W Technical Services Group, Inc.
3
.3 Covidien Reach Extends Globally and Locally Diverse healthcare products used in all clinical settings Diverse healthcare products used in all clinical settings 20,000+ U.S. employees, 41,000+ worldwide 20,000+ U.S. employees, 41,000+ worldwide Products manufactured in 17 states Products manufactured in 17 states Covidien Tc 99m-based products sold in all 50 states Covidien Tc 99m-based products sold in all 50 states Nuclear Medicine: One of two U.S. suppliers of technetium 99m (Tc 99m) One of two U.S. suppliers of technetium 99m (Tc 99m) Image used by permission of Covidien
4
.4 B&W MIPS – 99 Mo Production Using Aqueous Homogeneous Reactor Market studies in Late 1990s Patented in 1997 (Dr. Russell M. Ball) 2007 MIPS project re-initiated 2009 Agreement with Covidien 2009 Cooperative Agreement with NNSA Non-proliferation (LEU) Domestic supply AHR using LEU offers safety, safeguards, simplicity and waste advantages
5
.5 Over 30 AHRs Built and Operated AHRs are not New Technology CLEVELAND, OH SHEBA Reactor, LANL
6
.6 AHR - America’s First University Reactor N.C. State’s – R1 (1953-73)
7
.7 Dissolved Target Waste with 235 U Traditional Technology 235 U Target Fabrication Target Irradiation: Several days Reactor: 10,000 -100,000 kilowatts 99m Tc Generator Facility 99 Mo Processing Facility 99m Tc User Medical Facilities
8
.8 B&W MIPS Technology 99m Tc User Medical Facilities 99m Tc Generator Facility AHR Reactor 240 kilowatts- 5 days Reactor fuel/target solution returned for subsequent irradiation Initial Fuel Solution Preparation MIPS Facility 99 Mo Processing Cells
9
.9 Completing R&D Phase of Project National Laboratories Argonne Los Alamos Armed Forces Radiobiology Research Institute, MD Purdue University B&W Labs, VA INVAP, Argentina
10
.10 MIPS Project Progress Conceptual design complete NRC licensing and waste policy decisions complete Environmental analysis prepared Completing R&D activities Following legislation (HR 3276, S 99) Entering detailed design and licensing phase of the project
11
.11 B&W MIPS Summary Mo-99 production using LEU AHR results in: Increased efficiency Reduced waste No proliferation concerns Safe operation Stable domestic supply