Download presentation
Presentation is loading. Please wait.
Published byJeffrey Myles York Modified over 9 years ago
2
1 2 3 4 5 6 7
3
STOP 2 PASCUA-LAMA PROJECT View from Portal Site looking NNW at El Morro Oeste El Morro Oeste Frontera Trend
4
Pascua Extension Frontera Zone El Morro Oeste Pit Limit Pascua Fault Norte Fault PASCUA-LAMA PROJECT View from Penelope looking WNW towards Pascua STOP 3
5
STOP 4 View from El Morro PASCUA-LAMA PROJECT
6
Penelope Deposit Portal Pascua Fault Penelope Fault Pascua Extension STOP 5 PASCUA-LAMA PROJECT View from Rio Turbio Valley looking SW at Pascua Trend RDH-98-28 91m @ 5.91 g/t Au DDH-99-31 297m @ 4.67 g/t Au RDH-99-155 95m @ 143 g/t Ag
7
Penelope Deposit Brecha Penelope STOP 6 PASCUA-LAMA PROJECT Pascua Fault Zone View from Lama Camp looking WNW towards Penelope Discovery Hole RDH-98-28 91m @ 5.91 g/t Au RDH-99-150 62m @ 9.2 g/t Au
8
Lama Central El Morro Oeste Penelope Frontera Pascua Extension Nevada Norte Open Pit PASCUA-LAMA PROJECT View from Lower Rio Turbio looking WNW towards Pascua STOP 7 (Optional)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.