Papyrus Australia Walkamin Conversion Facility Status update Nov 2009
2
Entrance to Mt Uncle Plantation, Walkamin
3
New Lady Finger Plantation near the Papyrus facility
4
Concrete foundation / floor being poured December 2008
5
Steel work being erected January 2009
6
Internal view of new shed January 2009
7
Road front view of new facility at Walkamin January 2009
8
Gas storage area view from back of the facility January 2009
9
Veneer dryer install in progress February 2009
10
Veneer dryer installation nearing completion February 2009
11
Beta veneering Unit in Situ March 2009
12
Beta veneering Unit being commissioned March 2009
13
Oil transfer thermal heating unit being installed March 2009
14
Trunk Billetiser / conveying system installation March 2009
15
Veneer exiting the BVU into the factory during commissioning May 2009
16
Veneer being conveyed and quality checked May 2009
17
Veneer ready for drying
18
Veneer tones post drying
19
Veneered coffee table on display during the Monaco Yacht show Sept 2009
20
Veneered Unit on display during the Monaco Yacht show Sept 2009
21
Veneered TV Unit on display during the Monaco Yacht show Sept 2009
22
Jaguar Airbag panel on display during the Monaco Yacht show Sept 2009
24
Banana fibre board product displayed during the Monaco Yacht show Sept 2009
26
Banana fibre board model boat filled with accelerant and set alight until it self extinguished (the burn time was approx 20mins) – it remained afloat and intact with only internal surface charring
27
Dried veneers with its deep tones and contrasting stripe engineered through process control
28
Thank you for your attention