Download presentation
Presentation is loading. Please wait.
Published byLaura Terry Modified over 9 years ago
1
Safety and health at work is everyone’s concern. It’s good for you. It’s good for business. Planning seminar 30 September 2014 ESENER-2
2
2 www.esener.eu ESENER: European Survey of Enterprises on New and Emerging Risks 2014: October: Fieldwork completed November:Data preparation and delivery December:Technical reports 2015 Launch of ESENER-2 findings −First findings, overview and summary reports, online visualisation tool Launch of two secondary analysis projects: −Worker representation −Joint analysis LFS ad-hoc module and ESENER-2.
3
3 www.esener.eu ESENER-2: some changes,.. Greater geographical coverage ESENER-1ESENER-2 Countries Total of 31: EU-28 + Turkey, Norway, Switzerland Total of 36: ESENER-1 + Albania, Iceland, Macedonia, Montenegro and Serbia Establishments surveyed 30,00049,000 National versions of questionnaire -Adapted for language and national OSH terminology 4147 Increased proportion of workplaces covered ESENER-1ESENER-2 Smallest business size10 workers5 workers Sector All, including public, except agriculture and fishing All, including public and agriculture and fishing
4
4 www.esener.eu National sample boosts Funded by the national authorities. Same questionnaire. Country Reference sample size Final sample size –after boost Slovenia7501,050 Spain2,2503,150 United Kingdom2,2504,250
5
5 www.esener.eu ESENER – Secondary analyses Worker representation Joint analysis LFS ad-hoc module – ESENER-2 Brief description Organisation of worker representation in practice Face-to-face interviews in subset of respondents of ESENER-2 Six countries, minimum of 20 establishments, two interviews each LFS 2013 ad-hoc module on accidents at work and other work-related health problems To be published end 2014/early 2015 Lack of OSH stats in Europe – timing with ESENER-2 Joint analysis for comprehensive overview of state of OSH Both perspectives: workers and establishments. Timeline CfT launch: Oct 2014 Contract signature: Feb 2015 Project completion: Jul 2016 CfT launch: Feb 2015 Contract signature: Jul 2015 Project completion: Jul 2016
6
6 www.esener.eu ESENER outputs 2015-2016 Project 20152016 Survey (April) First findings Overview report Summary report (translated) Online data visualisation tool Technical reports –as from contractor Master questionnaire National questionnaires Methodological reports: translation, sampling, weighting Promotion Official launch: OSH conference / EP National events – portfolio? PPTs Video? -
7
7 www.esener.eu ESENER outputs 2015-2016 Project 20152016 Secondary analysis Worker representation - (July – final from contractor) Overview report (EN) Country reports (six) Summary report (translated into six languages) Secondary analysis Joint analysis LFS-ESENER-2 - (July – final from contractor) Overview report Summary report (translated?)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.