Download presentation
Presentation is loading. Please wait.
Published byBrenda Hawkins Modified over 9 years ago
1
First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003
2
TTF2 INJECTOR SCHEMATIC Jean-Paul CarneiroFIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM BC 2 (1)From P.Piot, EPAC 2002, p. 1798 (2) From S. Schreiber, private communication ACC 1 DOUBLETS. H.TRIPLET RF GUN + SOLENOIDES dump Bunch Charge1 nCOK Laser Diameter 3 mm (uniform)OK Laser pulse length 20 ps flat top + 3 ps rise time20 ps flat top + 6 ps rise time Solenoid Bmax163 mTOK Phase Gun34 DegOK Field Cathode40 MV/mOK ACC1 (cav 1 to 4)12.5 MV/m15 MV/m ACC1 (cav 5 to 8)20 MV/m15 MV/m Phase ACC1-10.8 Deg (w.r.t max energy) on crest ACC3914 MV/mnot present Phase ACC39183.0 Deg (w.r.t max energy)not present Nominal Operation (1)First Operation (2) STOP SIMULATIONS AT Z =19 M
3
Jean-Paul CarneiroFIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM TTF2 LASER (ASTRA GENERATOR OUTPUTS, 2E5 p.) Transverse distribution : uniform, r = 1.5 mm Longitudinal distribution : uniform, L=20 ps with ~5 ps rise times Thermal emittance : 55 keV From TELSA-FEL 97-01 (K. Floettmann) : Longitudinal distribution Transverse distribution
4
Jean-Paul CarneiroFIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM PHASE SCAN OF TESLA XFEL WITH ASTRA TTF2 NOMINAL : 40 MV/m, 0.163 T, L = 20 ps + 3 ps rise time, r =1.5 mm (plot presented at the S2E Workshop, DESY ZEUTHEN, AUG-2002, http://www.desy.de/s2e)
5
ENERGY AND ENERGY SPREAD Jean-Paul CarneiroFIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
6
Jean-Paul CarneiroFIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM LONG. PHASE SPACE AT Z=19 M (END INJECTOR) TAIL HEAD TAIL NOMINALFIRST OPERATION
7
EMITTANCE AND ENVELOPE Jean-Paul CarneiroFIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
8
Jean-Paul CarneiroFIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM BUNCH LENGTH
9
Jean-Paul CarneiroFIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM SPOT AND TRANSVERSE PHASE SPACE (AT Z =19 M)
10
Jean-Paul CarneiroFIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM SLICE EMITTANCE AND RMS SIZE (19 M)
11
Jean-Paul CarneiroFIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM CURRENT DISTRIBUTION (AT Z =19 M)
12
Jean-Paul CarneiroFIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM CONCLUSION CHARGE 1 nC 1 nC MOMEMTUN 121.7 MeV/c 134.05 MeV/c ENERGY SPREAD 0.9 [%] 0.2 [%] RMS EMITTANCE 1.28 [mm-mrad] 1.75 [mm-mrad] RMS SIZE 0.41 [mm] 0.41 [mm] BUNCH LENGTH 1.88 [mm] 2.1 [mm] PEAK CURRENT ~ 60 [A] ~ 40 [A] SLICE EMITTANCE ~ 1 [mm-mrad] ~ 1 [mm-mrad] NOMINALFIRST OPERATION
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.