Download presentation
Presentation is loading. Please wait.
Published byEvangeline Moore Modified over 9 years ago
1
RDB Services Vasu Vuppala FRIB-NSCL, East Lansing, Michigan, USA.
2
Overview 2 Current Activities Configuration Domain Cables Domain Etraveler Domain Naming System Domain Operations Domain V4 Integration CSS Integration Last Meeting Recap (March 2013)
3
Configuration Domain 3 Configuration Editing Authorization Design Management Calibration Inventory Configuration History Save/Restore Physical Component Types
4
Cables 4 Support request submission -> approval -> cable procurement -> cable installation workflow Meta information including user, building rooms, project WBS, cable types, and user-defined tags Alpha release this month Plan to test the application in ReA 6 project
5
Naming Convention System 5 Reports Initial Data Loading
6
Operations Domain 6 Activity Log Unscheduled Off Activity History Reports Shifts Operator on duty Architecture
7
V4 – Rdb - CSS 7 Normative Types Serialization API Normative Type representation in JSON CSS vs Web CSS Rdb Widgets?
8
Recap Last Meeting 8 Concerns Integration has not been tried or tested Lattice/Model: FRIB and BNL developing independent “modules” after cooperating on schema. Recommendations For Improvement Have a central website that links to all projects Have a portal (on cloud preferably) where all services/apps are deployed. Come up with suitable name and domain for the collaboration
9
Recap Last Meeting: Recommendations For Next Meeting 9 Have sessions on Technology Have short status presentations Have demos instead of other material (technology, architectures etc.) Have allocated timeslots for breakout sessions Have ‘meeting notes’ on Google Drive which everyone updates during meeting
10
Recap Last Meeting: Action Items 10 Vasu V to start integration efforts Bob D to start on a central deployment, test, and information site Paul C and Guobao S to work on a common API for Lattice/Model Klemen Z to explore ESS/Cosylab contributions: cables modularization Klemen Z to work on making Design Parameters Tool open-source
11
Development 11 Requirements Backlog Consolidated requirements and schedule Shared prioritization Trying out with Configuration Model Overall Dashboard
12
Next Quarter Goals 12 Online Model API Services Portal (from last meeting) Web Site (from last meeting) APIs and Domain Integration Security Integration Cables, Operations, Calibration Releases Configuration Versioning, Lattice Design V4/CSS Integration Software Engineering: Requirements Backlog, Status
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.