Presentation is loading. Please wait.

Presentation is loading. Please wait.

Technology Evaluation and Practical Aspects of Implementing Solar Energy in Indian Context.

Similar presentations


Presentation on theme: "Technology Evaluation and Practical Aspects of Implementing Solar Energy in Indian Context."— Presentation transcript:

1 Technology Evaluation and Practical Aspects of Implementing Solar Energy in Indian Context

2 India’s Import Bill Total Import bill USD 489.31 Million Crude oil and coal Import value USD 175.3 Million All the Figure in USD Millions

3 What would be $ price, if no Oil & Coal imports ?

4 Total Installed Electricity Capacity worldwide is about 20000 GW

5 Cost Reduction : various options Cost has already reduced for solar modules.

6 Silicon PV Cell: Raw Material to Modules

7 MW-Level Solar Power Plant Cost of MW-Level solar power plant – 7-8 Cr./MW

8 Next Cost Reduction Challenge…………. Balance of system cost: o 56% of total cost in case of roof-top systems. o Electronics, Batteries, cables, mounting structure, civil work etc.

9 Levelised Cost of Electricity : Solar Plant Cost7.20 Cr.Total Energy Generation over 25 Years 37.52 Million units Interest2.82 Cr. Maintenance & Spares 6.06 Cr. Total Expenses16.08 Cr Depreciation Benefit 2.37 Cr Net Expenses13.61 Cr AveragegUnit Cost(solar ) Net Expenses/ Total Energy Generation Rs. 3.60/Unit

10 New Technologies o Flexible, Transparent and high efficiency Solar module. o Storage Technologies o Water Pumping o Refrigaration

11 Conventional Solar modules Vs High Efficiency Solar Modules

12 Triple Junction Solar Cell with Thin Films

13 Plasma Texturing of Silicon Increases Optical Path Length This option can reduce silicon thickness by 50% and achieve low cost solar cells

14 Copper Indium Gallium Selenide (CIGS) Thin Film Solar

15 High efficiency flexible modules Building Integrated Photovoltaic (BIPV)

16

17 8 MW Solar Power Plant in Osmanabad, Maharashtra Copyright 2010 RelyOn Solar Our unique EPC model to build plants at lower costs with the best quality

18 PRADHIKARAN, PUNE Copyright 2010 RelyOn Solar Largest off-grid Installation in Maharashtra 100 KW

19 BHEL R & D Center, Hyderabad Copyright 2010 RelyOn Solar 250 KW grid interactive system

20 Business Point(Architectural Firm) Copyright 2010 RelyOn Solar 10 KW battery backed system powering a commercial office

21 Solar Water Pumps ( Irrigation) (Irrigation) Copyright 2010 RelyOn Solar Highly efficient DC & AC pumps upto 200 HP for irrigation

22 IOCL Petrol Pumps ( 100+ installations across country) Solar for petrol pumps is economical with a payback of less than 3 years


Download ppt "Technology Evaluation and Practical Aspects of Implementing Solar Energy in Indian Context."

Similar presentations


Ads by Google