Offshore Wind Farm Survey Requirements by by Mr Euan McNeill Business Development Manager (Coastal Surveys) and Senior Geophysicist Titan Environmental Surveys Ltd
2
Introduction: Site Survey Data Needs Data DataGeophysicsGeotechnicsOceanography (waves / currents) BenthicOrnithologyMeteorology (Met Mast Deployment) Titan’s Experience Titan’s Experience 7 Licences 2 Licences 6 Licences Approx. Cost (£K) Approx. Cost (£K) 40 - 60 >200 - 350 30 - 60 30 - 50 15 - 25
3
Data Relationships Time Key PSA Particle Size Analysis ES Echosounder SSS Side scan sonar SBP Sub-bottom profiler MAG Magnetometer CPT Cone Penetrometer test VC Vibrocorer Min and max wave height, current data
4
Data Examples Side Scan Sonar Data Sub-bottom Profiler Data Echosounder Data
5
Data Coverage for a Generic Site
6
Data Products Isopachyte Chart Cable Route Strip Chart Sub-bottom Profiles Seabed Features Chart
7
Conclusions: Site data required at an early stage Site data required at an early stage Geophysical survey should incorporate: Geophysical survey should incorporate: Bathymetry – Echosounder Seabed Features – Sidescan Sonar Shallow Geology – Sub-bottom Profiler Debris Location – Magnetometer EIA Foundation Engineering Cable Engineering (Landing sites / Topographic survey) Benthic Survey Workscope Targeted Geotechnical Survey Workscope Survey Data supports many other activities: Survey Data supports many other activities: Targeted data acquisition leads to cost savings later Targeted data acquisition leads to cost savings later