Presentation is loading. Please wait.

Presentation is loading. Please wait.

CAPT Bob Butler. 2 Level II Data Gathering – CNE Pilot Propulsion PQS Engineering NECs Universal PQSs Auxiliary PQS Electrical PQS Damage Control PQS.

Similar presentations


Presentation on theme: "CAPT Bob Butler. 2 Level II Data Gathering – CNE Pilot Propulsion PQS Engineering NECs Universal PQSs Auxiliary PQS Electrical PQS Damage Control PQS."— Presentation transcript:

1 CAPT Bob Butler

2 2 Level II Data Gathering – CNE Pilot Propulsion PQS Engineering NECs Universal PQSs Auxiliary PQS Electrical PQS Damage Control PQS BFIMA NECs JQRs CNE SHIP CLASS DATABASE PROGRAMS OF RECORD (POR) REQUIREMENTS Early steps: Creating Database from Programs of Record (POR) for 17 Ship Classes Ships Manpower Documents Occupational Standards Naval Standards Collateral Duties Leadership

3 DEP-GSM DEP-EM DEP-MM DEP-EN DEP-MR DEP-HT DEP-DC DEP-GSE BECC II To Fleet Units. GSE FN’S EM FN’S GSE FN’S EM FN’S ATT Self-paced 14 Days Electrical Engineering Technicians BOOT CAMP BECC 54 Days GSM FN’S EN FN’S MM FN’S Mechanical Engineering Technicians DC FN’S To Fleet Units. MR FN’S HT FN’S MR FN’S HT / MR Skill Training 30 Days Hull Repair Engineer To Fleet Units.

4 Engineering Schools

5 “A” Schools are based on Occupational Standards

6 Skill Object Comparison

7 ENGINEERING RATING MERGERS HTMRDCGSEEMMMENGSM HULL REPAIR ENGINEER ELECTRICAL ENGINEERING TECHNICIANS MECHANICAL ENGINEERING TECHNICIANS 8 TO 3 RATINGS BASED ON SKILLOBJECT KSAT ANALYSIS

8 Skill Object analysis

9 Engineering Plant Operators Course

10 10 Proposed EPOC Outline  Proposed Engineering Plant Operators Course Outline  Built from Program of Record  Based on Human Capital Object (HCO) billet needs  Integrated Learning Environment (ILE) Delivered  Computer Based Training (CBT)  Modeling and Simulation  Hand-on Labs with-in Fleet Concentration Area

11 11 EPOC “SEA WARRIOR POSITION CENTRIC TRAINING” GT Strand EPOC COMMON EET Skill Training STM Strand DSL Strand MET Skill Training HRE Skill Training Sailor Assigned to Sea Warrior Position With Advanced Occupational Skills / Training ILE CONTENT *Former “C” Schools FCA’s Pre-AssessmentPre-Assessment P E R F O R M A N C E - A S E S M E N T

12 12 TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT KSATKSAT SO Engineering SkillObjects SkillObject Level II KSATs dictate required ILE build ILEILE EPOC Common EPOC StrandEPOC Skill Training TLO – Terminal Learning Objective ELO – Enabling Learning Objective Asset EPOC ILE Content Build

13 13 Sea Power 21 “Position Centric Training” DDG 86 02860 (EM1) HCO CG-58 ------ (EM1) 5V Resume Sea Warrior HCO Skills Management System FFG 7 ------ (EM2) 5V Resume CNE Staff ------ (EM2) 5V Resume Candidate to Position KSAT delta Validated KSAT delta HCO ILE content TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset TLO ELO Asset HCO ILE content My Course Solution Pre-AssessmentPre-Assessment Selected P E R F O R M A N C E - A S E S M E N T Linked to NMETLS

14 14 NMETL to Aggregated Assets NMETL Mission A/Strategic National/Geo Combatant Cmdr/Monitor Worldwide & Theater Strategic Situation & Conditions/Stds SO 06-162 Propulsion Operations Supervision (EOOW - All GT Ships) TASK Supervise Propulsion Systems Alignment NTL 1.1.1.7.1 Provide Engineering/Main Propulsion CWF SUB-TASK Supervise aligning Air Conditioning plant SPECIFIC KNOWLEDGE Capabilities of System

15 15 NMETL All approved Work at a Unit Occupational Position Object (SkillObjects) Collateral Duty Requirement (SkillObjects) Watches (Skillobjects HUMAN CAPITAL OBJECT SAILOR Performance Intervention Requisition All positional and organizational work for one Sailor Contains Gap analysis Unit may modify Generates when gapped Forms Base of Assigned by unit Creates requirement for Includes Linked via critical work functions Human Capital Object RTN BILLET

16 M 1 FWD

17 M2 RTN


Download ppt "CAPT Bob Butler. 2 Level II Data Gathering – CNE Pilot Propulsion PQS Engineering NECs Universal PQSs Auxiliary PQS Electrical PQS Damage Control PQS."

Similar presentations


Ads by Google