2 The Plan

3 Realistic Improvements in order of Priority

4 List of Improvements and priorities 1. Add skirting and continue railings to the whole surrounding area and paint matching school colours. 2. Remove aluminium glassed areas and add railings to continue the same theme. 3. Add seating and tables in the centre of the courtyard and around the perimeter. Tables need to be of a material that students can work at – (ie: timber slats like in regular picnic tables will not be suitable). I suggest honed concrete slabs? 4. Add tiered seating to the area outside Rm 5. 5. Re-surfacing to make level and of one similar surface material. NO grass in there at all! 6. A playhouse area (in keeping with the school roof shape and “ steeple ” ) Blackboard paint, painted to ply which will sit under railings to the floor. 7. Raised garden with pretty flowers and totem poles (made by kids) 8. Remove raised concrete gardens and trees. The areas will need to be re- concreted. The only remaining trees are to be the native punga type trees outside Rm 7 and Room 9 bag area. 9. Some kind of low height water feature. Needs to be low so that people at each table can see each other and communicate – if a whole class was to be working outside there.

5 Adding skirting boards and continue wide railings to the whole surrounding area and paint matching school colours. 1

6 45m linear meters required to close in the whole surrounds Possible material – R/S Palings (25 x 150 x 1500) 25 x 150 (not r/s 4.60 pm) Approx 150 palings @ $2.45ea – 2.76$414.00 Nails$ 50.00 Paint$ 80.00 Additional railing behind “skirting” (100 x 50) 45 linear meters 6m lengths @ $14 (8 X 6m lengths)$112.00 Total of materials$656.00 The Skirting Surrounds

7 Rail (300x50 H3 gauged) $34.19pm X 25m (est) required$854.75 Bolts Unsure of materials needed to fix$100.00 Total $954.75 Additional Wide Railing (due to removal of aluminium enclosures)

8 Adding skirting boards and continue wide railings to the whole surrounding area and paint matching school colours. 1 $ 1610.75

9 Remove aluminium glassed areas and add railings to continue the same theme. 2

10 Working Bee (Free Labour)$ Free Total $Free Removing Aluminium Enclosures

11 Add seating and tables in the centre of the courtyard and around the perimeter. Tables need to be of a material that students can work at – (ie: timber slats like in regular picnic tables will not be suitable). I suggest honed concrete slabs? 3

12 Reuse and relocate current Seating$Free Adding Table and Chairs 4 large “picnic” typed tables with a bench seat either side Approx $600 per table?$2400 Total $2400 Adding Seating

13 Add tiered seating to the area outside Rm 5. 4

14 Builder to build a two layered Seating arrangement outside Rm 5 Cost Estimate $1200 Total $1200 Adding Teired Seating

15 Re-surfacing to make level and of one similar surface material. NO grass in there at all! 5

16 Coloured Astro turf Cost Estimate $4000 Or Concrete ($2500)? Total $4000 Astroturf It!

17 A playhouse area (in keeping with the school roof shape and “ steeple ” ) Blackboard paint, painted to ply which will sit under railings to the floor. 6

18 Playhouse$1000.00 Blackboards Plywood – 4 sheets (1200 x 2400) $65 ea x 4$ 260.00 Blackboard Paint$ 50.00 Total $1310 Playhouse and Blackboards

19 Raised garden with pretty flowers and totem poles (made by kids) 7

20 Raised Timber edge$ 50.00 Bark$100.00 Flowers and Plantings$350.00 Weed matting$ 40.00 Totem Poles 1 per classroom (5) 5 x Full rounds ($20 ea)$100.00 Paint Bright colours$ 60.00 Total $ 700.00 Garden

21 Remove raised concrete gardens and trees. The areas will need to be re-concreted. The only remaining trees are to be the native punga type trees outside Rm 7 and Room 9 bag area. 8

22 Labour$ Free Concrete/paver re-filling$200.00 Total $ 200.00 Removal of raised concrete borders

23 Some kind of low height water feature. Needs to be low so that people at each table can see each other and communicate – if a whole class was to be working outside there. 9

24 Water Feature$ 400.00 Pump/Installation$200.00 Electrical Work$200.00 Total $ 800.00 Concrete Water Feature

25 So…..

26 The Plan?

27 1. Skirting Boards$ 656.00 Additional (wide) Railing$ 954.75 2. Aluminium Removal$ Free 3. Table and Chairs$2400.00 4. Tiered Seating by Rm 5$1200.00 5. Total Resurfacing$4000.00 6. Playhouse/Blackboards$1310.00 7. Raised garden (plants)$ 700.00 8. Removing Concrete Border (trees)$ 200.00 9. Water Feature$ 800.00 Total $12,220.75